Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Title 

Showing results 2381 to 2400 of 5974

2381
Heuristic Algorithm for Minimizing Earliness-Tardiness on a Single Burn-In Oven in Semiconductor Manufacturing

Sung, Chang Sup, International Conference on Modeling and Analysis of Semiconductor Manufacturing (2002), pp.1 - 6, 2002

2382
Heuristic algorithm for nurse assignment and visit scheduling in a home healthcare system = 가정 간호 시스템에서 환자에 대한 간호사 할당 및 간호사의 환자 방문 일정 계획에 관한 연구link

Kim, Seung-Dae; 김승대; et al, 한국과학기술원, 2010

2383
HEURISTIC ALGORITHM FOR THE TOOL MOVEMENT POLICY IN FLEXIBLE MANUFACTURING SYSTEMS

Song, CY; Hwang, H; Kim, Yeong-Dae, JOURNAL OF MANUFACTURING SYSTEMS, v.14, no.3, pp.160 - 168, 1995

2384
Heuristic algorithms for a military training timetabling problem = 신병 훈련 계획 시간표 작성을 위한 알고리듬 개발link

Lee, Si-Young; 이시영; et al, 한국과학기술원, 2004

2385
Heuristic algorithms for a multi-period multi-stop transportation planning problem

Kim, JU; Kim, Yeong-Dae; Shim, SO, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.53, no.9, pp.1027 - 1037, 2002-09

2386
Heuristic Algorithms for a Single-Machine Common Due Date Assignment under Earliness/Tardiness Measure

Sung, Chang Sup, JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, v.36, no.3, pp.121 - 133, 1993-04

2387
Heuristic algorithms for a supply chain network design problem in dairy industry = 유가공산업의 공급사슬네트워크 설계를 위한 휴리스틱 알고리듬link

Nasir, Jamal Abdul; Nasir, Jamal Abdul; Kim, Yeong-Dae; 김영대; et al, 한국과학기술원, 2013

2388
Heuristic algorithms for a variant of orienteering problem = 용량제약이 있는 다경로 오리엔티어링 문제의 해법에 관한 연구link

Park, Keum-Ae; 박금애; et al, 한국과학기술원, 2007

2389
Heuristic algorithms for assigning and scheduling flight missions in a military aviation unit

Kim, Bong-Kyun; Kim, Yeong-Dae, COMPUTERS INDUSTRIAL ENGINEERING, v.61, no.4, pp.1309 - 1317, 2011-11

2390
Heuristic algorithms for order picking in automated warehousing systems = 자동창고 시스템의 물품 불출을 위한 근사적 해법link

Kim, Deok-Soo; 김덕수; Bai, Do-Sun; Hwang, Hark; et al, 한국과학기술원, 1987

2391
Heuristic algorithms to minimize total tardiness in an identical-parallel-machine scheduling problem with flexible maintenance

Lee, Ju-Yong; Kim, Yeong-Dae; Jeong, BongJoo, Asia Pacific Industrial Engineering and Management Systems Conference , Philippine Institute of Industrial Engineers, 2013-12-06

2392
Heuristic approach for prePack optimization of product distribution = 제품 배분을 위한 PrePack 휴리스틱 알고리즘 제안link

Lee, Juyeong; 이주영; et al, 한국과학기술원, 2015

2393
Heuristic approach for project scheduling problems with resource-duration interactions = 효율이 서로 다른 자원들을 활용한 프로젝트 추진 일정계획 수립link

Lim, Soo-Kyoung; 임수경; et al, 한국과학기술원, 1995

2394
HEURISTIC APPROACHES FOR LOADING PROBLEMS IN FLEXIBLE MANUFACTURING SYSTEMS

Kim, Yeong-Dae; Yano, CandaceArai, IIE TRANSACTIONS, v.25, no.1, pp.26 - 39, 1993-01

2395
Heuristic for the assort-packing and distribution problem in the fashion apparel industry

Sung, Shin Woong; Jang, Young Jae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.56, no.9, pp.3116 - 3133, 2018-06

2396
Heuristics for a tool provisioning problem in a flexible manufacturing system with an automatic tool transporter

Jun, HB; Kim, YD; Suh, Hyo-Won, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.15, no.3, pp.488 - 496, 1999-06

2397
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint

Kim, Yeong-Dae; Joo, Byung-Jun; Shin, Jong-Ho, JOURNAL OF HEURISTICS, v.15, no.1, pp.19 - 42, 2009-02

2398
HEURISTICS FOR A TWO-STAGE HYBRID FLOWSHOP SCHEDULINGPROBLEM WITH INCOMPATIBLE JOB FAMILIES

Joo, Byung-Jun; Kim, Yeong-Dae, Asia Pacific Industrial Engineering and Management Systems Conference, pp.31.15.1 - 31.15.7, 2004

2399
Heuristics for determining a patrol path of an unmanned combat vehicle

Park, Chul-Hwan; Kim, Yeong-Dae; Jeong, BongJoo, COMPUTERS & INDUSTRIAL ENGINEERING, v.63, no.1, pp.150 - 160, 2012-08

2400
HEURISTICS FOR FLOWSHOP SCHEDULING PROBLEMS MINIMIZING MEAN TARDINESS

Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.44, no.1, pp.19 - 28, 1993-01

rss_1.0 rss_2.0 atom_1.0