Showing results 1 to 2 of 2
A heuristic algorithm for a production planning problem in an assembly system Park, MW; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.50, no.2, pp.138 - 147, 1999-02 |
Design and operation problems of a two-level supply chain for production-time-dependent products = 생산 시간 비례 제품군에 대한 공급 사슬 설계 및 운용에 관한 연구link Han, Jun Hee; 한준희; Kim, Yeong Dae; 김영대; et al, 한국과학기술원, 2015 |
Discover