Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Author Kim, Hyun-Jung

Showing results 1 to 35 of 35

1
A heuristic algorithm for identical parallel machine scheduling: splitting jobs, sequence-dependent setup times, and limited setup operators

Lee, Jun-Ho; Kim, Hyun-Jung, FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, v.33, no.4, pp.992 - 1026, 2021-12

2
A Multi-Manned Assembly Line Worker Assignment and Balancing Problem With Positional Constraints

Yang, Hyungjoon; Lee, Je-Hun; Lee, Sang Hyun; Lee, Seung Gi; Kim, Hyung Rok; Kim, Hyun-Jung, IEEE ROBOTICS AND AUTOMATION LETTERS, v.7, no.3, pp.7786 - 7793, 2022-07

3
A Petri net-based modeling and scheduling with a branch and bound algorithm

Kim, Hyun-Jung; Lee, Tae-Eog; Lee, Jun-Ho, IEEE Conference on Systems, Man, and Cybernetics, IEEE, 2012-10-16

4
A Sequential Search Method of Dispatching Rules for Scheduling of LCD Manufacturing Systems

Lee, Je-Hun; Kim, Young; Kim, Yun Bae; Kim, Byung-Hee; Jung, Gu-Hwan; Kim, Hyun-Jung, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.33, no.4, pp.496 - 503, 2020-11

5
A SIMULATION-BASED SEQUENTIAL SEARCH METHOD FOR MULTI-OBEJCTIVE SCHEDULING PROBLEMS OF MANUFACTURING SYSTEMS

Lee, Je-Hun; Kim, Young; Kim, Yun Bae; Kim, Byung-Hee; Chung, Gu-Hwan; Kim, Hyun-Jung, Winter Simulation Conference, pp.1943 - 1953, IEEE, 2020-12-18

6
(A) branch and bound algorithm for scheduling of flexible manufacturing systems = 유연 제조 시스템 스케줄링을 위한 분기한정법link

Ahn, Jeongsun; Kim, Hyun-Jung; et al, 한국과학기술원, 2022

7
An exact algorithm for an identical parallel additive machine scheduling problem with multiple processing alternatives

Kim, Jun; Kim, Hyun-Jung, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.60, no.13, pp.4070 - 4089, 2022-07

8
Cycle planning and input sequencing for concurrent processing in semiconductor manufacturing tool = 반도체 제조 장비 내 혼류 공정을 위한 주기 및 웨이퍼 투입 순서 결정 방법link

Kim, Hong-Yeon; 김홍연; et al, 한국과학기술원, 2024

9
Deep Reinforcement Learning With a Look-Ahead Search for Robotic Cell Scheduling

Kim, Hyun-Jung; Lee, Jun-Ho, IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, v.54, no.1, pp.622 - 633, 2024-01

10
Digital twin-based cyber physical production system architectural framework for personalized production

Park, Kyu Tae; Lee, Jehun; Kim, Hyun-Jung; Noh, Sang, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, v.106, no.5-6, pp.1787 - 1810, 2020-01

11
Hybrid flowshop scheduling with no-wait and blocking constraints = 연속생산 및 차단 제약이 있는 하이브리드 플로우샵 스케줄링link

Kim, Chae-young; 김채영; et al, 한국과학기술원, 2024

12
Item Assignment Problem in a Robotic Mobile Fulfillment System

Kim, Hyun-Jung; Pais, Cristobal; Shen, Zuo-Jun Max, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.17, no.4, pp.1854 - 1867, 2020-10

13
Iterative job splitting algorithms for parallel machine scheduling with job splitting and setup resource constraints

Lee, Jun-Ho; Jang, Hoon; Kim, Hyun-Jung, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.72, no.4, pp.780 - 799, 2021-03

14
l1 Trend Filtering-Based Change Point Detection for Pumping Line Balance of Deposition Equipment

Ahn, Jeongsun; Kim, Duyeon; Song, Mingi; Min, Jaehong; Hwang, Jimin; Kwon, Juhye; Kim, Hyun-Jung, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.35, no.1, pp.137 - 145, 2022-02

15
Look-ahead based reinforcement learning for robotic flow shop scheduling

Kim, Hyun-Jung; Lee, Jun-Ho, JOURNAL OF MANUFACTURING SYSTEMS, v.68, pp.160 - 175, 2023-06

16
Multi-manned assembly line worker assignment and balancing problem with positional constraints = 위치 제약이 반영된 조립 라인의 작업자 할당 및 균형 문제의 해결법 연구link

Yang, Hyungjoon; Kim, Hyun-Jung; et al, 한국과학기술원, 2022

17
Non-cyclic scheduling and timing control of timed Petri nets = 시간을 갖는 페트리 넷의 비주기적 스케줄링 및 시간 제어link

Kim, Hyun-Jung; 김현정; et al, 한국과학기술원, 2013

18
Optimal scheduling of transient cycles for single-armed cluster tools

Kim, Dae-Kyu; Lee, Tae-Eog; Kim, Hyun-Jung, IEEE International Conference on Automation Science and Engineering, pp.874 - 879, IEEE, 2013-08-17

19
Parallel machine scheduling with multiple processing alternatives and sequence-dependent setup times

Kim, Jun; Kim, Hyun-Jung, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.59, no.18, pp.5438 - 5453, 2021-09

20
Reinforcement learning for robotic flow shop scheduling with processing time variations

Lee, Jun-Ho; Kim, Hyun-Jung, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.60, no.7, pp.2346 - 2368, 2022-04

21
Rescheduling of unrelated parallel machines with job-dependent setup times under forecasted machine breakdown

Kim, Young-In; Kim, Hyun-Jung, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.59, no.17, pp.5236 - 5258, 2021-09

22
Scheduling a wet station using a branch and bound algorithm

Kim, Hyun-Jung; Lee, Tae-Eog; Lee, Jun-Ho, IEEE Conference on Systems, Man, and Cybernetics, IEEE, 2012-10-16

23
Scheduling Cluster Tools With Ready Time Constraints for Consecutive Small Lots

Kim, Hyun-Jung; Lee, Jun-Ho; Jung, Chi-Hyun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.10, no.1, pp.145 - 159, 2013-01

24
Scheduling in-line multiple cluster tools: A decomposition approach

Kim, Hyun-Jung; Lee, Tae-Eog; Lee, Jun-Ho; Kim, Chulhan; Baik, Sun-Hee, IEEE Conference on Mechatronics and Automation, IEEE, 2012-08-08

25
Scheduling of cluster tools with ready time constraints for small lot production

Lee, Tae-Eog; Kim, Hyun-Jung, IEEE 2011 International Conference on Automation Science and Engineering, pp.96 - 101, IEEE, 2011-08-25

26
Scheduling of Dual-Gripper Robotic Cells With Reinforcement Learning

Kim, Hyun-Jung; Lee, Jun-Ho, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.19, no.2, pp.1120 - 1136, 2022-04

27
Scheduling timed Petri nets with a time-feasible reachability tree

Kim, Hyun-Jung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE Conference on Networking, Sensing, and Control, pp.94 - 99, IEEE Systems, Man, and Cybernetics Society, 2013-04-10

28
Scheduling transient periods of dual-armed cluster tools

Lee, Tae-Eog; Lee, Jun-Ho; Kim, Hyun-Jung, IEEE Conference on Mechatronics and Automation, IEEE, 2012-08-08

29
Scheduling uniform parallel dedicated machines with job splitting, sequence-dependent setup times, and multiple servers

Kim, Hyun-Jung; Lee, Jun-Ho, COMPUTERS & OPERATIONS RESEARCH, v.126, 2021-02

30
Single-machine scheduling with energy generation and storage systems

Kim, Hyun-Jung; Kim, Eun-Seok; Lee, Jun-Ho; Tang, Lixin; Yang, Yang, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.60, no.23, pp.7033 - 7052, 2022-12

31
Special Issue on Analysis, Design, and Optimization in Smart and Connected Production and Service Systems

Li, Jingshan; Yan, Chao-Bo; Kim, Hyun-Jung; Xie, Xiaolei; Lee, Hyo-Kyung, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.60, no.13, pp.3945 - 3947, 2022-07

32
The Impact of Processing Time Variations on Swap Sequence Performance in Dual-Armed Cluster Tools

Lee, Jun-Ho; Kim, Hyun-Jung, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.20, no.4, pp.2668 - 2677, 2023-10

33
TWO-STAGE LOT SCHEDULING WITH WAITING TIME CONSTRAINTS AND DUE DATES

Yu, Tae-Sun; Kim, Hyun-Jung; Jung, Chanwhi; Lee, Tae-Eog, Winter Simulation Conference on Simulation - Making Decisions in a Complex World, pp.3630 - 3641, IEEE, 2013-12-09

34
소 로트 웨이퍼 제조를 위한 가용시간 제약이 있는 클러스터 장비의 스케줄링 방법 = Scheduling of cluster tools with ready time constraints for small lot wafer fabricationlink

김현정; Kim, Hyun-Jung; et al, 한국과학기술원, 2011

35
소 로트 웨이퍼 제조를 위한 가용시간 제약이 있는 클러스터 장비의 스케줄링 방법 = Scheduling of cluster tools with ready time constraints for small lot wafer fabricationlink

김현정; Kim, Hyun-Jung; et al, 한국과학기술원, 2011

rss_1.0 rss_2.0 atom_1.0