Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Author Sung, Chang Sup

Showing results 96 to 105 of 105

96
Scheduling in a Two-machine Flowshop with Batch Processing Machine(s) for Earliness/Tardiness Measure under a Common Due Date

Sung, Chang Sup; Min, JI, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.131, no.1, pp.95 - 106, 2001-05

97
Scheduling of a Flow Shop without Intermediate Queues but with Job Holders Required for Processing

Sung, Chang Sup, pp.0 - 0, 1993-04-01

98
Scheduling of parallel machines to minimize total completion time subject to s-precedence constraints

Kim, Eun-Seok; Sung, Chang Sup; Lee, Ik-Sun, COMPUTERS & OPERATIONS RESEARCH, v.36, no.3, pp.698 - 710, 2009

99
Scheduling of Products with Common and Product-Dependent ComponentsManufactured at a Single Facility

Sung, Chang Sup, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.44, no.8, pp.773 - 784, 1993-01

100
SETUP COST REDUCTION IN A DYNAMIC LOT-SIZE MODEL WITH MULTIPLE FINITE PRODUCTION-RATES

Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.24, no.1, pp.19 - 37, 1995

101
Simple Enumeration of Minimal Cutsets Separating 2 Vertices in a Class of Undirected Planar Graphs

Sung, Chang Sup, IEEE TRANSACTIONS ON RELIABILITY, v.41, no.1, pp.63 - 71, 1992-01

102
Single Machine Product Scheduling with Outsourcing Allowed

Sung, Chang Sup, Multidisciplinary International Conference on Scheduling:Theory and Applications(MISTA), pp.1 - 23, 2005

103
Single machine scheduling with outsourcing allowed

Lee, Ik Sun; Sung, Chang Sup, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.111, no.2, pp.623 - 634, 2008-02

104
Technical Note on a Parallel-Facilities Production Planning Model with CapacityConstraints

Sung, Chang Sup; j. h. byun, COMPUTERS AND OPERATIONS RESEARCH, v.15, no.6, pp.585 - 587, 1988-01

105
Trend in IT Development in 21st Century

Sung, Chang Sup, International Conference on Business, Technology & Intellectual Property in IT Age, pp.129 - 138, 2001

rss_1.0 rss_2.0 atom_1.0