Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Author Sung, Chang Sup

Showing results 86 to 105 of 105

86
PARAMETRIC MAX-FLOW PROBLEMS IN A CLASS OF NETWORKS WITH SERIES-PARALLEL STRUCTURE

Sung, Chang Sup, COMPUTERS & OPERATIONS RESEARCH, v.21, no.7, pp.769 - 776, 1994-01

87
Performance Analysis of a Queueing System with Facilities Requiring Post-Processing

Sung, Chang Sup, COMPUTERS & OPERATIONS RESEARCH, v.19, no.8, pp.767 - 781, 1992-01

88
PERFORMANCE MODELING OF AN FMS WITH FINITE INPUT AND OUTPUT BUFFERS

Sung, Chang Sup; KWON, ST, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.37, no.2-3, pp.161 - 175, 1994-12

89
Production Planning and Shipment Scheduling for a Multi-Product ( 1:1:N) Inventory Model with Cyclic Production Policy Incorporated

Sung, Chang Sup, 2003 MSOM conference(INFORMS), pp.1 - 16, 2003

90
Production-Delivery Scheduling Problem in Supply Chain Management

Sung, Chang Sup, Multi-Echelon/MSOM 2004, 2004

91
(r,Q) Policy for a Single-Product Production/Inventory Problem with a Compound Poisson Demand Process

Sung, Chang Sup; geun tae oh, JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, v.30, no.2, pp.132 - 149, 1987-01

92
Receiver set partitioning and sequencing for multicasting traffic in a WDM lightwave single-hop network

Sung, Chang Sup; Rim, HC, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.55, no.6, pp.630 - 639, 2004-06

93
Reliability Optimization of a Series System with Multiple-Choice and Budget Constraints

Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.127, no.1, pp.159 - 171, 2000-11

94
ROLLING SCHEDULES FOR A DYNAMIC LOT-SIZING PROBLEM WITH START-UP COST

Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.22, no.2, pp.137 - 152, 1994

95
Routing for a Multicommodity Traffic Problem with Transmission Delay and Load Balancing Considered

Sung, Chang Sup; Yang W., Proceedings of the International Conference on Communications in Computing, CIC'03, pp.86 - 92, 2003-06-23

96
Scheduling in a Two-machine Flowshop with Batch Processing Machine(s) for Earliness/Tardiness Measure under a Common Due Date

Sung, Chang Sup; Min, JI, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.131, no.1, pp.95 - 106, 2001-05

97
Scheduling of a Flow Shop without Intermediate Queues but with Job Holders Required for Processing

Sung, Chang Sup, pp.0 - 0, 1993-04-01

98
Scheduling of parallel machines to minimize total completion time subject to s-precedence constraints

Kim, Eun-Seok; Sung, Chang Sup; Lee, Ik-Sun, COMPUTERS & OPERATIONS RESEARCH, v.36, no.3, pp.698 - 710, 2009

99
Scheduling of Products with Common and Product-Dependent ComponentsManufactured at a Single Facility

Sung, Chang Sup, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.44, no.8, pp.773 - 784, 1993-01

100
SETUP COST REDUCTION IN A DYNAMIC LOT-SIZE MODEL WITH MULTIPLE FINITE PRODUCTION-RATES

Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.24, no.1, pp.19 - 37, 1995

101
Simple Enumeration of Minimal Cutsets Separating 2 Vertices in a Class of Undirected Planar Graphs

Sung, Chang Sup, IEEE TRANSACTIONS ON RELIABILITY, v.41, no.1, pp.63 - 71, 1992-01

102
Single Machine Product Scheduling with Outsourcing Allowed

Sung, Chang Sup, Multidisciplinary International Conference on Scheduling:Theory and Applications(MISTA), pp.1 - 23, 2005

103
Single machine scheduling with outsourcing allowed

Lee, Ik Sun; Sung, Chang Sup, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.111, no.2, pp.623 - 634, 2008-02

104
Technical Note on a Parallel-Facilities Production Planning Model with CapacityConstraints

Sung, Chang Sup; j. h. byun, COMPUTERS AND OPERATIONS RESEARCH, v.15, no.6, pp.585 - 587, 1988-01

105
Trend in IT Development in 21st Century

Sung, Chang Sup, International Conference on Business, Technology & Intellectual Property in IT Age, pp.129 - 138, 2001

rss_1.0 rss_2.0 atom_1.0