Showing results 3 to 3 of 3
Simplification methods for accelerating simulation-based real-time scheduling in a semiconductor wafer fabrication facility Kim, Yeong-Dae; Shim, SO; Choi, B; Hwang, Hark, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.16, pp.290 - 298, 2003-05 |
Discover