Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Subject flowshop

Showing results 4 to 8 of 8

4
Minimization of Waiting Time Variation in a Generalized Two-Machine Flowshop With Waiting Time Constraints and Skipping Jobs

Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.30, no.2, pp.155 - 165, 2017-05

5
Minimizing Due Date Related Peformance Measures on Two Batch Processing Machines

Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.147, no.3, pp.644 - 656, 2003-06

6
Minimizing makespan on an m-machine re-entrant flowshop

Choi, Seong-Woo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.35, no.5, pp.1684 - 1696, 2008-05

7
Scheduling in a Two-machine Flowshop with Batch Processing Machine(s) for Earliness/Tardiness Measure under a Common Due Date

Sung, Chang Sup; Min, JI, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.131, no.1, pp.95 - 106, 2001-05

8
Two-stage hybrid flowshop scheduling problem with a product ratio constraint under dynamic job arrivals = 제품별 구성 비율 제약이 있는 혼합 흐름 공정에서 최대 종료 시간을 최소화하는 스케쥴링 방법 개발link

Shin, Jong-Ho; 신종호; et al, 한국과학기술원, 2003

rss_1.0 rss_2.0 atom_1.0