Showing results 2 to 4 of 4
Fixed pre-assembly scheduling on multiple fabrication machines Yoon, Sang Hum; Sung, Chang Sup, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.96, no.1, pp.109 - 118, 2005-04 |
Joint configuration of backbone and logical networks on a reconfigurable packet-switched network with unreliable links Lee, JH; Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.30, no.3, pp.309 - 331, 1998-04 |
Minimizing Total Weighted Completion Time at a Pre-assembly Stage Composed of Tow Feeding Machines Sung, Chang Sup, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.54, no.3, pp.247 - 255, 1998-04 |
Discover