Showing results 1 to 3 of 3
Chebyshev center based column generation Lee, Chung Mok; Park, Sungsoo, DISCRETE APPLIED MATHEMATICS, v.159, no.18, pp.2251 - 2265, 2011-12 |
Minimization of Waiting Time Variation in a Generalized Two-Machine Flowshop With Waiting Time Constraints and Skipping Jobs Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.30, no.2, pp.155 - 165, 2017-05 |
Minimizing makespan on a two-machine re-entrant flowshop Choi, SW; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.58, pp.972 - 981, 2007-07 |
Discover