Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Title 

Showing results 2441 to 2460 of 6088

2441
Heuristic algorithms for a variant of orienteering problem = 용량제약이 있는 다경로 오리엔티어링 문제의 해법에 관한 연구link

Park, Keum-Ae; 박금애; et al, 한국과학기술원, 2007

2442
Heuristic algorithms for assigning and scheduling flight missions in a military aviation unit

Kim, Bong-Kyun; Kim, Yeong-Dae, COMPUTERS INDUSTRIAL ENGINEERING, v.61, no.4, pp.1309 - 1317, 2011-11

2443
Heuristic algorithms for order picking in automated warehousing systems = 자동창고 시스템의 물품 불출을 위한 근사적 해법link

Kim, Deok-Soo; 김덕수; Bai, Do-Sun; Hwang, Hark; et al, 한국과학기술원, 1987

2444
Heuristic algorithms to minimize total tardiness in an identical-parallel-machine scheduling problem with flexible maintenance

Lee, Ju-Yong; Kim, Yeong-Dae; Jeong, BongJoo, Asia Pacific Industrial Engineering and Management Systems Conference , Philippine Institute of Industrial Engineers, 2013-12-06

2445
Heuristic approach for prePack optimization of product distribution = 제품 배분을 위한 PrePack 휴리스틱 알고리즘 제안link

Lee, Juyeong; 이주영; et al, 한국과학기술원, 2015

2446
Heuristic approach for project scheduling problems with resource-duration interactions = 효율이 서로 다른 자원들을 활용한 프로젝트 추진 일정계획 수립link

Lim, Soo-Kyoung; 임수경; et al, 한국과학기술원, 1995

2447
HEURISTIC APPROACHES FOR LOADING PROBLEMS IN FLEXIBLE MANUFACTURING SYSTEMS

Kim, Yeong-Dae; Yano, CandaceArai, IIE TRANSACTIONS, v.25, no.1, pp.26 - 39, 1993-01

2448
Heuristic for the assort-packing and distribution problem in the fashion apparel industry

Sung, Shin Woong; Jang, Young Jae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.56, no.9, pp.3116 - 3133, 2018-06

2449
Heuristics for a tool provisioning problem in a flexible manufacturing system with an automatic tool transporter

Jun, HB; Kim, YD; Suh, Hyo-Won, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.15, no.3, pp.488 - 496, 1999-06

2450
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint

Kim, Yeong-Dae; Joo, Byung-Jun; Shin, Jong-Ho, JOURNAL OF HEURISTICS, v.15, no.1, pp.19 - 42, 2009-02

2451
HEURISTICS FOR A TWO-STAGE HYBRID FLOWSHOP SCHEDULINGPROBLEM WITH INCOMPATIBLE JOB FAMILIES

Joo, Byung-Jun; Kim, Yeong-Dae, Asia Pacific Industrial Engineering and Management Systems Conference, pp.31.15.1 - 31.15.7, 2004

2452
Heuristics for determining a patrol path of an unmanned combat vehicle

Park, Chul-Hwan; Kim, Yeong-Dae; Jeong, BongJoo, COMPUTERS & INDUSTRIAL ENGINEERING, v.63, no.1, pp.150 - 160, 2012-08

2453
HEURISTICS FOR FLOWSHOP SCHEDULING PROBLEMS MINIMIZING MEAN TARDINESS

Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.44, no.1, pp.19 - 28, 1993-01

2454
Heuristics for inventory and delivery management of online-retailer = 온라인 상점의 재고 및 배송 관리를 위한 휴리스틱 알고리즘link

여수민; Yeo, Soo-Min; et al, 한국과학기술원, 2008

2455
Heuristics for locating two types of public health-care facilities

Kim, Dong-Geun; Kim, Yeong-Dae; Lee, Taesik, INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, v.11, no.2, pp.202 - 214, 2012-06

2456
Heuristics for minimizing makespan on parallel dedicated machines with family setups = 셋업이 있는 병렬 전용 기계 공정에서의 최대 종료 시간을 최소화 하는 스케쥴링 알고리듬 개발link

Kim, Kyoung-Yeon; 김경연; et al, 한국과학기술원, 2007

2457
Heuristics for parallel machine scheduling problem with history dependent setup times = 생산 이력 정보에 의한 셋업시간이 발생하는 병력작업 기계에서의 스케쥴링 방법 개발link

Lim, Tae-Kyu; 임태규; et al, 한국과학기술원, 2004

2458
Heuristics for scheduling burn-in operations in a semiconductor test facility to minimize total tardiness = 반도체 제조 공정 중 번인 공정에서의 납기를 고려한 스케줄링 알고리듬 개발link

Lee, Kyoung-Eun; 이경은; et al, 한국과학기술원, 2005

2459
Heuristics for scheduling jobs with distinct ready times on a two-stage hybrid flowhop scheduling problem with a product-mix ratio constraint

Joo, Byung-Jun; Shin, Jong-Ho; Kim, Yeong-Dae, Asia-Pacific Management Conference, pp.965 - 978, 2004

2460
Heuristics for Scheduling Wafer Lots at the Deposition Workstation in a Semiconductor Wafer Fab

최성우; 임태규; 김영대, 대한산업공학회지, v.36, no.2, pp.125 - 137, 2010-06

rss_1.0 rss_2.0 atom_1.0