162281 | Production of zinc protoporphyrin IX by metabolically engineered Escherichia coli Choi, Kyeong Rok; Yu, Hye Eun; Lee, Sang Yup, BIOTECHNOLOGY AND BIOENGINEERING, v.119, no.11, pp.3319 - 3325, 2022-11 |
162282 | Production of β-alanine (3-aminopropionic acid) in a metabolically engineered Escherichia coli Yang, Dongsoo; Song, Chan Woo; Lee, J.; Ko, Yoo-Sung; Lee, Sang Yup, The Seventh International Meeting on Synthetic Biology, BioBricks Foundation, 2017-06-13 |
162283 | Production og urolinase type plasminogen activator with recombinant CHO in Serum & protein free medium Kim, Jung Hoe; Chang, KH, 일본동물세포공학회, 일본동물세포공학회 |
162284 | Production planning and control in semiconductor wafer fabrication and probing facilities = 반도체 웨이퍼 제조공정과 프로브공정의 생산 계획 작성 및 통제에 관한 연구link Bang, June-Young; 방준영; et al, 한국과학기술원, 2009 |
162285 | Production planning and scheduling in a leadframe manufacturing system Lee, Geun-Cheol; Choi, Yong-Chan; Lee, Eun-Young; Kim, Yeong-Dae, INFOMRS-KORMS 2000, pp.970 -, 2000 |
162286 | Production Planning and Sequencing Optimization at Woongjin Chemical Sung, Shin Woong; Jang, Young Jae; Lee, Dong Seop, Asia Pacific Industrial Engineering & Management Systems Conference, Asia Pacific Industrial Engineering and Management Society, 2013-12-05 |
162287 | Production Planning and Shipment Scheduling for a Multi-Product ( 1:1:N) Inventory Model with Cyclic Production Policy Incorporated Sung, Chang Sup, 2003 MSOM conference(INFORMS), pp.1 - 16, 2003 |
162288 | Production planning for fabrication and packaging processes of light emitting diodes with overlapped product binning = 제품 분화가 중첩되는 발광다이오드의 제조 및 조립 공정의 생산계획link Yang, Ji-Won; Lee, Tae-Eog; et al, 한국과학기술원, 2019 |
162289 | Production planning in a two-level supply chain for production-time-dependent products with dynamic demands Han, Jun-Hee; Lee, Ju-Yong; Kim, Yeong-Dae, COMPUTERS & INDUSTRIAL ENGINEERING, v.135, pp.1 - 9, 2019-09 |
162290 | Production planning method using the push-back heuristic algorithm: Implementation in a micro filter manufacturer in South Korea Sung, Shin Woong; Jang, Young Jae; Lee, Sung Wook, INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, v.14, no.4, pp.401 - 412, 2015-12 |
162291 | Production process development of natural gas hydrate and physicochemical analysis of artificial hydrate materials as new energy resources = 천연 가스 하이드레이트 생산기법 개발 및 인공 하이드레이트 물질의 새로운 에너지 자원화를 위한 물리화학적 분석link Koh, Dong-Yeun; 고동연; et al, 한국과학기술원, 2013 |
162292 | Production risk management system with demand probability distribution Tanaka, Kenji; Akimoto, Hiromichi; Inoue, Masato, ADVANCED ENGINEERING INFORMATICS, v.26, no.1, pp.46 - 54, 2012-01 |
162293 | Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates Kim, Yeong-Dae; Kim, JG; Kim, HU, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.17, no.5, pp.589 - 598, 2001-10 |
162294 | Production scheduling in a system with batch processing machines = 뱃치 공정 설비를 갖춘 시스템에서의 생산일정계획link Choung, You-In; 정유인; et al, 한국과학기술원, 1999 |
162295 | Production Scheduling in Assembly/Disaasembly System 성창섭, 한국경영과학회/대한산업공학회 춘계공동학술대회, 1995 |
162296 | Production scheduling in assembly/disassembly systems = 조립 및 분리 생산 시스템에서의 일정계획link Yoon, Sang-Hum; 윤상흠; et al, 한국과학기술원, 1997 |
162297 | Production scheduling of products with subassemblies = 부분조립품을 가지는 제품의 생산일정계획link Kim, Tae-Hyung; 김태형; et al, 한국과학기술원, 1993 |
162298 | Production sequencing problem with re-entrant work flows and sequence dependent setup times Hwang, Hark, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.36, no.9, pp.2435 - 2450, 1998 |
162299 | Production Sequencing Problem with Reentrant Work Flows and Sequence Dependent Setup Times Hwang, Hark, , 1996-01-01 |
162300 | Production Sequencing Problem with Reentrant Work Flows and Sequence Dependent Setup Times Hwang, Hark, COMPUTERS & INDUSTRIAL ENGINEERING, v.33, no.3, pp.773 - 776, 1997-01 |