172741 | Scheduling of Dual-Armed Cluster Tools with Time Constraints Kim, Ja-Hee; Lee, Tae-Eog; Lee, Hwan-Yong, MASM, pp.1 - 6, 2002-04 |
172742 | Scheduling of Dual-Gripper Robotic Cells With Reinforcement Learning Kim, Hyun-Jung; Lee, Jun-Ho, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.19, no.2, pp.1120 - 1136, 2022-04 |
172743 | Scheduling of flexible manufacturing systems employing automated guided vehicles Lee, Doo Yong, International Conference on CAD/CAM Robotics and Factories of the Future, pp.139 - 144, 1993-08 |
172744 | Scheduling of manufacturing systems with reentrant work flows and sequence dependent setup times = 작업 순서에 종속적인 세트업시간 및 재진입 작업 흐름을 갖는 제조시스템의 스케쥴링link Sun, Ji-Ung; 선지웅; et al, 한국과학기술원, 1999 |
172745 | Scheduling of multi-level parts in a flexible manufacturing system = 유연 제조 시스템에서 다단계 부품의 일정 계획에 관한 연구link Kim, Jung-Ug; 김정욱; et al, 한국과학기술원, 1994 |
172746 | Scheduling of multi-slot cluster tools with wafer delay constraintslink Jee, Young-Jun; Lee, Tae-Eog; et al, 2021 |
172747 | Scheduling of multimedia traffic for continuous media in packet-switched networks Khil, Ara; Maeng, SeungRyoul, Multimedia Computing and Networking, SPIE, pp.29 - 40, International Society for Optical Engineering (SPIE), 1997-01 |
172748 | Scheduling of parallel machines to minimize total completion time subject to s-precedence constraints Kim, Eun-Seok; Sung, Chang Sup; Lee, Ik-Sun, COMPUTERS & OPERATIONS RESEARCH, v.36, no.3, pp.698 - 710, 2009 |
172749 | Scheduling of periodically-arriving task batches = 동적 수요를 위한 선행관계에 있는 과제집단의 일정계획link Yoon, Sang-Hum; 윤상흠; et al, 한국과학기술원, 1992 |
172750 | Scheduling of Petri nets as a multi-objective shortest path problem Wikborg, Uno; Lee, Tae-Eog, IEEE Conference on Automation Science and Engineering, IEEE, 2012-08-22 |
172751 | Scheduling of Primary Steelmaking Processes with an Optimal Control Approach Park, Sunwon, KIChE Spring Meeting, KIChE, 2000-01-01 |
172752 | Scheduling of Primary Steelmaking Processes: Part 1. Mathematical Modeling Park, Sunwon, KIChE Spring Meeting, KIChE, 2000-01-01 |
172753 | Scheduling of Primary Steelmaking processes: Part II. Environmentally Friendly Scheduling Park, Sunwon, KIChE Spring Meeting, KIChE, 2000-01-01 |
172754 | Scheduling of Products with Common and Product-Dependent ComponentsManufactured at a Single Facility Sung, Chang Sup, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.44, no.8, pp.773 - 784, 1993-01 |
172755 | Scheduling of real-time and nonreal-time traffics in IEEE 802.11 wireless LANs = IEEE 802.11 무선 랜 시스템에서의 실시간 및 비실시간 트래픽 스케쥴링link Lee, Ju-Hee; 이주희; et al, 한국과학기술원, 2002 |
172756 | Scheduling of real-time traffics in IEEE 802.11 wireless LANs = IEEE 802.11 무선 랜 시스템에서의 실시간 트래픽 스케쥴링link Jeong, Dong-Woon; 정동운; et al, 한국과학기술원, 2003 |
172757 | Scheduling of Refinery Processes with An Optimal Control Approach Park, Sunwon, The 8th Congress of Asian Pacific Confederation of Chemical Engineering (APCChE'99), Proceedings on 8th APCChE Congress, 1999-01-01 |
172758 | Scheduling of Refinery Processes with An Otpimal Control Approach Park, Sunwon, KIChE Spring Meeting, KIChE, 1999-01-01 |
172759 | Scheduling of refinery processes with optimal control approach Park, H; Bok, JK; Park, Sunwon, JOURNAL OF CHEMICAL ENGINEERING OF JAPAN, v.34, no.3, pp.411 - 422, 2000-01 |
172760 | Scheduling of semi-independent real-time components: Overrun methods and resource holding times Behnam, M.; Shin, Insik; Nolte, T.; Nolin, M., IEEE Symposium on Emerging Technologies and Factory Automation, v.0, no.0, pp.575 - 582, IEEE, 2008-09 |