Showing results 1 to 7 of 7
A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness Lee, GC; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.42, pp.4731 - 4743, 2004-11 |
A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times Sung, Chang Sup; Kim, Hyun Ah, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.113, no.2, pp.1038 - 1048, 2008 |
Algorithms for Aircraft Flight and Maintenance Scheduling in an Army Aviation Unit Lee, Dong-Hoon; Jeong, Bong-Joo; Kim, Bong-Kyun; Lee, Ju-Yong; Jang, Sebong; Kim, Yeong-Dae, MILITARY OPERATIONS RESEARCH, v.21, no.3, pp.5 - 17, 2016 |
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint Kim, Yeong-Dae; Joo, Byung-Jun; Shin, Jong-Ho, JOURNAL OF HEURISTICS, v.15, no.1, pp.19 - 42, 2009-02 |
Modeling, Analysis, and Scheduling of Cluster Tools With Two Independent Arms Tonke, Daniel; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.2, pp.1176 - 1188, 2016-04 |
Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation Kim, Tae-Kyu; Jung, Chihyun; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.50, no.10, pp.2785 - 2795, 2012 |
Scheduling Wafer Lots on Diffusion Machines in a Semiconductor Wafer Fabrication Facility Kim, Yeong-Dae; Joo, BJ; Choi, SY, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.23, pp.246 - 254, 2010-05 |
Discover