Browse "IE-Journal Papers(저널논문)" by Subject PARALLEL MACHINES

Showing results 1 to 7 of 7

1
A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness

Lee, GC; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.42, pp.4731 - 4743, 2004-11

2
A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times

Sung, Chang Sup; Kim, Hyun Ah, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.113, no.2, pp.1038 - 1048, 2008

3
Algorithms for Aircraft Flight and Maintenance Scheduling in an Army Aviation Unit

Lee, Dong-Hoon; Jeong, Bong-Joo; Kim, Bong-Kyun; Lee, Ju-Yong; Jang, Sebong; Kim, Yeong-Dae, MILITARY OPERATIONS RESEARCH, v.21, no.3, pp.5 - 17, 2016

4
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint

Kim, Yeong-Dae; Joo, Byung-Jun; Shin, Jong-Ho, JOURNAL OF HEURISTICS, v.15, no.1, pp.19 - 42, 2009-02

5
Modeling, Analysis, and Scheduling of Cluster Tools With Two Independent Arms

Tonke, Daniel; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.2, pp.1176 - 1188, 2016-04

6
Scheduling start-up and close-down periods of dual-armed cluster tools with wafer delay regulation

Kim, Tae-Kyu; Jung, Chihyun; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.50, no.10, pp.2785 - 2795, 2012

7
Scheduling Wafer Lots on Diffusion Machines in a Semiconductor Wafer Fabrication Facility

Kim, Yeong-Dae; Joo, BJ; Choi, SY, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.23, pp.246 - 254, 2010-05

Discover

Type

Open Access

Date issued

. next

Subject

. next

rss_1.0 rss_2.0 atom_1.0