DC Field | Value | Language |
---|---|---|
dc.contributor.author | 임성진 | ko |
dc.contributor.author | 이두용 | ko |
dc.date.accessioned | 2013-03-02T16:14:59Z | - |
dc.date.available | 2013-03-02T16:14:59Z | - |
dc.date.created | 2012-02-06 | - |
dc.date.created | 2012-02-06 | - |
dc.date.issued | 1997-05 | - |
dc.identifier.citation | 대한기계학회논문집 A, v.21, no.5, pp.769 - 779 | - |
dc.identifier.issn | 1226-4873 | - |
dc.identifier.uri | http://hdl.handle.net/10203/74372 | - |
dc.description.abstract | This paper presents an approach to multiple objective scheduling of flexible manufacturing systems(FMS). The approach is an extension of the scheduling method that formulates scheduling problems using Petrinets, and applies heuristic search to find optimal or near-optimal schedules with a single objective. New evaluation functions are developed to optimize simultaneously the makespan and the total operating cost. A scheduling example is used to demonstrate the effectiveness of the proposed approach. | - |
dc.language | Korean | - |
dc.publisher | 대한기계학회 | - |
dc.title | 페트리네트를 이용한 유연 생산시스템의 다중목표 스케쥴링 | - |
dc.title.alternative | Multiple Objective Scheduling of Flexible Manufacturing Systems Using Petri Nets | - |
dc.type | Article | - |
dc.type.rims | ART | - |
dc.citation.volume | 21 | - |
dc.citation.issue | 5 | - |
dc.citation.beginningpage | 769 | - |
dc.citation.endingpage | 779 | - |
dc.citation.publicationname | 대한기계학회논문집 A | - |
dc.contributor.localauthor | 이두용 | - |
dc.contributor.nonIdAuthor | 임성진 | - |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.