IE-Journal Papers(저널논문)

Recent Items

Collection's Items (Sorted by Submit Date in Descending order): 1921 to 1940 of 2078

1921
Design of capacitated networks with tree configurations

Lee, K; Park, K; Park, Sungsoo, TELECOMMUNICATION SYSTEMS, v.6, no.1, pp.1 - 19, 1996

1922
Joint price and lot size determination under conditions of permissible delay in payments and quantity discounts for freight cost

Shinn, SW; Hwang, H; Park, Sungsoo, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.91, no.3, pp.528 - 542, 1996-06

1923
A POLYHEDRAL APPROACH TO EDGE COLORING

NEMHAUSER, GL; Park, Sungsoo, OPERATIONS RESEARCH LETTERS, v.10, no.6, pp.315 - 322, 1991-08

1924
Optimal routing and wavelength assignment in WDM ring networks

Lee, T; Lee, K; Park, Sungsoo, IEEE JOURNAL ON SELECTED AREAS IN COMMUNICATIONS, v.18, no.10, pp.2146 - 2154, 2000-10

1925
A branch-and-price algorithm for a targeting problem

Kwon, O; Lee, K; Kang, D; Park, Sungsoo, NAVAL RESEARCH LOGISTICS, v.54, no.7, pp.732 - 741, 2007-10

1926
Comparison of wavelength requirements between two wavelength assignment methods in survivable WDM networks

Lee, T; Park, Sungsoo, ANNALS OF OPERATIONS RESEARCH, v.146, pp.75 - 89, 2006

1927
An analytical method for three-dimensional location estimation using directional data

Lee, H. J.; Kim, Yeong-Dae, ENGINEERING OPTIMIZATION, v.40, no.1, pp.17 - 32, 2008-01

1928
A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules

Jeong, KC; Kim, Yeong-Dae, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.36, no.9, pp.2609 - 2626, 1998-09

1929
MINIMIZING TOTAL TARDINESS IN PERMUTATION FLOWSHOPS

Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.85, no.3, pp.541 - 555, 1995-09

1930
A multi-period order selection problem in flexible manufacturing systems

Lee, DH; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.49, no.3, pp.278 - 286, 1998-03

1931
Simulated annealing and genetic algorithms for scheduling products with multi-level product structure

Kim, JU; Kim, Yeong-Dae, COMPUTERS OPERATIONS RESEARCH, v.23, no.9, pp.857 - 868, 1996-09

1932
A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property

Shim, Sang-Oh; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.35, no.3, pp.863 - 875, 2008-03

1933
Capacity planning for phased implementation of flexible manufacturing systems under budget restrictions

Lim, SK; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.104, no.1, pp.175 - 186, 1998-01

1934
Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process

Kim, Yeong-Dae; Lim, HG; Park, MW, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.91, no.1, pp.124 - 143, 1996-05

1935
Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility

Kim, Yeong-Dae; Kim, JU; Lim, SK; Jun, HB, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.11, no.1, pp.155 - 164, 1998-02

1936
Heuristics for search sequencing under time-dependent probabilities of existence

Lee, Ho-Joo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.34, no.7, pp.2010 - 2024, 2007-07

1937
GRAPH-THEORETIC HEURISTICS FOR UNEQUAL-SIZED FACILITY LAYOUT PROBLEMS

KIM, JY; Kim, Yeong-Dae, OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, v.23, no.4, pp.391 - 401, 1995-08

1938
Heuristics for a tool provisioning problem in a flexible manufacturing system with an automatic tool transporter

Jun, HB; Kim, YD; Suh, Hyo-Won, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.15, no.3, pp.488 - 496, 1999-06

1939
Scheduling on parallel identical machines to minimize total tardiness

Shim, SO; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.177, pp.135 - 146, 2007-02

1940
A simulation-based heuristic algorithm for disposition of direction finders

Lee, Ho-Joo; Kim, Yeong-Dae; Lee, Sang-Beom, COMPUTERS & INDUSTRIAL ENGINEERING, v.55, no.1, pp.134 - 149, 2008-08

Discover

Type

Open Access

Date issued

. next

Subject

. next

rss_1.0 rss_2.0 atom_1.0