Results 1-3 of 3 (Search time: 0.01 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Single machine scheduling with outsourcing allowed Lee, Ik Sun; Sung, Chang Sup, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.111, no.2, pp.623 - 634, 2008-02 | |
Joint configuration of backbone and logical networks on a reconfigurable packet-switched network with unreliable links Lee, JH; Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.30, no.3, pp.309 - 331, 1998-04 | |
SETUP COST REDUCTION IN A DYNAMIC LOT-SIZE MODEL WITH MULTIPLE FINITE PRODUCTION-RATES Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.24, no.1, pp.19 - 37, 1995 |
Discover