Results 11-18 of 18 (Search time: 0.003 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Schedule Restoration for Single-Armed Cluster Tools Kim, Ja-Hee; Zhou, MengChu; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.27, no.3, pp.388 - 399, 2014-08 | |
MINIMIZING TOTAL TARDINESS ON PARALLEL MACHINES SUBJECT TO FLEXIBLE MAINTENANCE Lee, Ju-Yong; Kim, Yeong-Dae; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v.25, no.4, pp.472 - 489, 2018-12 | |
A branch and bound algorithm to minimize total tardiness of jobs in a two identical-parallel-machine scheduling problem with a machine availability constraint Lee, Ju Yong; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.66, no.9, pp.1542 - 1554, 2015-09 | |
Scheduling Dual-Armed Cluster Tools for Concurrent Processing of Multiple Wafer Types With Identical Job Flows Ko, Sung-Gil; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.3, pp.1058 - 1070, 2019-07 | |
Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04 | |
Scheduling In-Line Multiple Cluster Tools Kim, Hyunjung; Lee, Jun-Ho; Baik, Sunhee; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.28, no.2, pp.171 - 179, 2015-05 | |
Scheduling Lot Switching Operations for Cluster Tools Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.26, no.4, pp.592 - 601, 2013-11 | |
Scheduling dual-armed cluster tools with cleaning processes Kim, Hee-Jung; Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.51, no.12, pp.3671 - 3687, 2013-06 |
Discover