Algorithms for design and scheduling problems in parallel assembly systems병렬 조립 시스템에서의 설계 및 작업스케쥴링에 관한 연구

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 556
  • Download : 0
This dissertation focuses on design and scheduling problems in a parallel-line assembly system producing multiple product types. Each line in this system can be regarded as an assembly system, in which a series of operations is processed while the products are moved on a conveyor system. These problems can be found in an air conditioner manufacturing system composed of parallel assembly lines that produce multiple product types. In this dissertation, we develop algorithms for a design problem in an assembly system and then, we develop scheduling algorithms for parallel assembly manufacturing systems with multiple product types. First, we focus on a design problem in an assembly system composed of parallel assembly lines that produce multiple product types. In the assembly system, different types of products can be assigned to the same line and each product type can be assigned to multiple lines. In the design problem, therefore, we consider decisions on the assignment of product types to the assembly lines including production quantities of each product type on each line. The cycle time of each line or the speed of the transport system of each line can be determined by the assignment. We formulate the problem to a non-liner mixed integer model and develop an algorithm based on Benders’ decomposition approach as well as heuristic algorithms for the problem with the objective of minimizing the weighed sum of workload imbalance of the lines. Here, the workload imbalance of a line is measured by the time differences between the cycle time and processing times of the operations of the product types on the line. Note that this weighted sum represents the sum of idle times of the assembly lines, or the time loss (loss of capacity) of the lines, which are caused by assigning product types requiring different processing time to the same line. Secondly, we focus on a scheduling problem in an air conditioner manufacturing system composed of multiple parallel assembl...
Advisors
Kim, Yeong-Daeresearcher김영대researcher
Description
한국과학기술원 : 산업및시스템공학과,
Publisher
한국과학기술원
Issue Date
2010
Identifier
418782/325007  / 000995377
Language
eng
Description

학위논문(박사) - 한국과학기술원 : 산업및시스템공학과, 2010.2, [ vii, 93 p. ]

Keywords

Benders Decomposition algorithm; Scheduling problem; Design problem; parallel-line assembly system; heuristic algorithm; 발견적 기법; 벤더즈 분해 방법; 스케쥴링문제; 디자인문제; 병렬조립시스템

URI
http://hdl.handle.net/10203/40657
Link
http://library.kaist.ac.kr/search/detail/view.do?bibCtrlNo=418782&flag=dissertation
Appears in Collection
IE-Theses_Ph.D.(박사논문)
Files in This Item
There are no files associated with this item.

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0