Identical parallel machine scheduling with peak energy consumption constraints에너지 소모 상한을 고려한 병렬기계 스케줄링

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 69
  • Download : 0
Recently, due to the lack of fossil fuel resources and the increase in greenhouse gases generated in the manufacturing process, industrial sites are trying to reduce energy use, and at the same time, energy use is being restricted. This study deals with the scheduling problem of minimizing energy consumption in parallel machines with peak energy consumption constraints. First, we model the problem through mathematical modeling techniques and derive an optimal solution using a branch-and-bound method. Through experiments, we compare the performance of a branch-and-bound method and optimization commercial tools.
Advisors
Kim, Hyun Jungresearcher김현정researcher
Description
한국과학기술원 :산업및시스템공학과,
Publisher
한국과학기술원
Issue Date
2022
Identifier
325007
Language
eng
Description

학위논문(석사) - 한국과학기술원 : 산업및시스템공학과, 2022.8,[iii, 33 p. :]

Keywords

Parallel machine▼aEnergy▼aBranch-and-bound▼aOptimization▼aScheduling; 병렬기계▼a에너지▼a분기 한정법▼a최적화▼a스케줄링

URI
http://hdl.handle.net/10203/308774
Link
http://library.kaist.ac.kr/search/detail/view.do?bibCtrlNo=1008279&flag=dissertation
Appears in Collection
IE-Theses_Master(석사논문)
Files in This Item
There are no files associated with this item.

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0