Job scheduling optimization based on ratio of stall to active cycles스톨 대 작동 사이클의 비에 기초가 된 작업 스케줄링 최적화

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 228
  • Download : 0
An apparatus and a job scheduling method are provided. For example, the apparatus is a multi-core processing apparatus. The apparatus and method minimize performance degradation of a core caused by sharing resources by dynamically managing a maximum number of jobs assigned to each core of the apparatus. The apparatus includes at least one core including an active cycle counting unit configured to store a number of active cycles and a stall cycle counting unit configured to store a number of stall cycles and a job scheduler configured to assign at least one job to each of the at least one core, based on the number of active cycles and the number of stall cycles. When the ratio of the number of stall cycles to a number of active cycles for a core is too great, the job scheduler assigns fewer jobs to that core to improve performance.
Assignee
KAIST
Country
US (United States)
Application Date
2014-05-13
Application Number
14276522
Registration Date
2016-08-02
Registration Number
9405349
URI
http://hdl.handle.net/10203/275229
Appears in Collection
EE-Patent(특허)
Files in This Item
There are no files associated with this item.

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0