Results 1-3 of 3 (Search time: 0.003 seconds).
NO | Title, Author(s) (Publication Title, Volume Issue, Page, Issue Date) |
---|---|
Enhanced Exchange Heuristic based Resource Constrained Scheduler using ARTMAP Song, I.; Yang, Taeyong, Computers & IE, 1996 | |
Resource Constrained Scheduling with Neural Network based Enhanced Exchange Heuristic Song, I.; Yang, Taeyong; Chen, J.G., Industrial Engineering Applications and Practice, pp.522 - 529, 1996 | |
A Study on a Hybrid Expert System with Exchange Heuristics for Real-Time Scheduling in Flexible Manufacturing System Environment Song, I.; Kim, J.; Yang, Taeyong, Industrial Engineering Applications and Practice, pp.498 - 503, 1996 |
Discover