Minimizing job change leads maximizing utilization. To minimize job change, the efficient job change plan is needed. But the process of job
change is very time-consuming and hard to consider various constraints such as job change crew, work in progress (WIP), tool and availability of equipment. In this paper, the simulation of constructing the Gantt chart for efficient job change planning in LCD industry is proposed as it is called Gantt chart simulation (GCS)