Gantt chart Simulation based Job Change Planning for LCD Industry

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 843
  • Download : 440
Minimizing job change leads maximizing utilization. To minimize job change, the efficient job change plan is needed. But the process of job change is very time-consuming and hard to consider various constraints such as job change crew, work in progress (WIP), tool and availability of equipment. In this paper, the simulation of constructing the Gantt chart for efficient job change planning in LCD industry is proposed as it is called Gantt chart simulation (GCS)
Publisher
IFIP
Issue Date
2010-08
Language
English
Citation

IFIP5.3. APMS (Advances in Production Management System) 2010 International Conference

URI
http://hdl.handle.net/10203/171393
Appears in Collection
IE-Conference Papers(학술회의논문)

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0