Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Type Article

Showing results 1081 to 1140 of 2082

1081
Locally optimal adaptive smoothing splines

Kim, Heeyoung; Huo, Xiaoming, JOURNAL OF NONPARAMETRIC STATISTICS, v.24, no.3, pp.665 - 680, 2012

1082
Locating a distance-dependent facility on an undirected network with continuous link weights

Sung, Chang Sup; cheol min joo, ENGINEERING OPTIMIZATION, v.27, no.4, pp.341 - 366, 1997

1083
LOCATING AN OBNOXIOUS FACILITY ON A EUCLIDEAN NETWORK TO MINIMIZE NEIGHBORHOOD DAMAGE

Sung, Chang Sup; cheol min joo, NETWORKS, v.24, no.1, pp.1 - 9, 1994

1084
LOCATION DESIGN FOR EMERGENCY MEDICAL CENTERS BASED ON CATEGORY OF TREATABLE MEDICAL DISEASES AND CENTER CAPABILITY

Ko, Young Dae; Song, Byung Duk; Morrison, James R.; Hwang, Hark, INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, v.21, no.3, pp.117 - 128, 2014

1085
Location Planning for Dynamic Wireless Charging Systems for Electric Airport Passenger Buses

Helber, Stefan; Broihan, Justine; Jang, Young Jae; Hecker, Peter; Feuerle, Thomas, ENERGIES, v.11, no.2, 2018-01

1086
Long-term and blow-up behaviors of exponential moments in multi-dimensional affine diffusions

Jena, Rudra P.; Kim, Kyoung-Kuk; Xing, Hao, STOCHASTIC PROCESSES AND THEIR APPLICATIONS, v.122, no.8, pp.2961 - 2993, 2012-08

1087
Look-ahead based reinforcement learning for robotic flow shop scheduling

Kim, Hyun-Jung; Lee, Jun-Ho, JOURNAL OF MANUFACTURING SYSTEMS, v.68, pp.160 - 175, 2023-06

1088
Low-rank, Orthogonally Decomposable Tensor Regression With Application to Visual Stimulus Decoding of fMRI Data

Poythress, JC; Ahn, Jeongyoun; Park, Cheolwoo, JOURNAL OF COMPUTATIONAL AND GRAPHICAL STATISTICS, v.31, no.1, pp.190 - 203, 2022-03

1089
LVC 연동을 위한 VR 탱크 시뮬레이터 구현

강석일; 이태억; 이창조, 한국엔터테인먼트산업학회논문지, v.11, no.1, pp.265 - 273, 2017-01

1090
M(X)/G/1 VACATION MODELS WITH N-POLICY - HEURISTIC INTERPRETATION OF THE MEAN WAITING TIME

Chae, Kyung-Chul; LEE, HW, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.46, no.2, pp.258 - 264, 1995-02

1091
M/G/1 대기행렬의 최적 D-정책 분석

채경철; 박연일, 대한산업공학회지, v.25, no.4, pp.527 - 531, 1999-12

1092
M/M/2 직렬-서어버 모형의 분석 및 응용

양원석; 채경철, 한국경영과학회지, v.22, no.2, pp.1 - 12, 1997-06

1093
M/M/c/K 대기행렬 시스템의 바쁜 기간 분석

채경철; 임대은, 한국경영과학회지, v.31, no.1, pp.83 - 90, 2006-03

1094
Machine capacity allocation strategies for scheduling a large multi-chip assembly line

Lee, Sang-Jin; Lee, Tae-Eog, EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, v.5, pp.327 - 337, 2011

1095
Machine Layout Problem in Direcect-Input-Output Manufacturing System

황학, 산업공학(IE INTERFACES), v.9, no.2, pp.203 - 218, 1996-01

1096
Machine learning based evolutionary algorithms and optimization for transportation and logistics Preface

Cheng, John; Yang, Bin; Gen, Mitsuo; Jang, Young Jae; Liang, Cheng-Ji, COMPUTERS & INDUSTRIAL ENGINEERING, v.143, 2020-05

1097
Machining efficiency comparison direction-parallel tool path with contour-parallel tool path

Kim, BH; Choi, Byoung Kyu, COMPUTER-AIDED DESIGN, v.34, no.2, pp.89 - 95, 2002-02

1098
Machining Tool Path Generation for Point Set

Park, Seyoun; Shin, Hayong, International Journal of CAD/CAM, v.8, no.1, pp.45 - 53, 2008-12

1099
Maintenance of deteriorating single server queues with random shocks

Yang, Won Seok; Lim, Dae Eun; Chae, Kyung-Chul, COMPUTERS & INDUSTRIAL ENGINEERING, v.57, no.4, pp.1404 - 1406, 2009-11

1100
Maintenance of multi-state production systems deteriorated by random shocks and production

Yang, Won Seok; Lim, Dae E.; Chae, Kyung-Chul, JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING, v.20, no.1, pp.110 - 118, 2011-03

1101
Makespan Analysis of Lot Switching Period in Cluster Tools

Lee, Jun-Ho; Kim, Hyunjung, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.29, no.2, pp.127 - 136, 2016-05

1102
Makespan minimization for a 2-stage assembly scheduling problem subject to component available time constraint

Sung, Chang Sup; Juhn, Jaeho, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, v.119, no.2, pp.392 - 401, 2009-03

1103
Management of Deteriorating Inventory under Inflation

Hwang, Hark; kwon-ik sohn, ENGINEERING ECONOMIST, v.28, no.3, pp.191 - 206, 1983

1104
Management strategy of full-service carrier and its subsidiary low-cost carrier

Ko, Young-Dae; Hwang, Hark, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, v.52, no.1-4, pp.391 - 405, 2011-01

1105
Managing system design process using axiomatic design: A case on KAIST mobile Harbor project

Lee, Taesik; Park, G, SAE INTERNATIONAL JOURNAL OF MATERIALS AND MANUFACTURING, v.3, no.1, pp.125 - 132, 2010-08

1106
Mapping product structures between CAD and PDM systems using UML

Oh, Y; Han, S.H; Suh, Hyo-Won, COMPUTER-AIDED DESIGN, v.33, no.7, pp.521 - 529, 2001-06

1107
MapReduce 기반 분산 이미지 특징점 추출을 활용한 빠르고 확장성 있는 이미지 검색 알고리즘

송환준; 이진우; 이재길, 정보과학회논문지, v.42, no.12, pp.1474 - 1479, 2015-12

1108
Market and Shadow Prices in a Pure Consumption Economy With Institutional Price Constraints

김세헌, 한국OR학회지, v.10, no.1, pp.31 - 40, 1985-04

1109
Markov decision process model for patient admission decision at an emergency department under a surge demand

Lee, Hyun-Rok; Lee, Tae-Sik, FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, v.30, no.1-2, pp.98 - 122, 2018-06

1110
Matrix representation for NURB curves and surfaces

Choi, Byoung Kyu; Yoo, W.S.; Lee, C.S., COMPUTER-AIDED DESIGN, v.22, no.4, pp.235 - 240, 1990-05

1111
Maximization of carried traffic by prioritizing new call attempts in a CDMA base station with finite receiver processors

Kim, I; Kim, D; Kim, Sehun, IEICE TRANSACTIONS ON COMMUNICATIONS, v.E89B, pp.1879 - 1882, 2006-06

1112
Maximizing MapReduce job speed and reliability in the mobile cloud by optimizing task allocation

Lee, Jin-woo; Jang, Gwangseon; Jung, Hohyun; Lee, Jae-Gil; Lee, Uichin, PERVASIVE AND MOBILE COMPUTING, v.60, 2019-11

1113
Maximizing total job value on a single machine with job selection

Eun, Joonyup; Sung, Chang Sup; Kim, Eun-Seok, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.68, no.9, pp.998 - 1005, 2017-09

1114
MDP에 의한 컬링 전략 선정

김동현; 배기욱; 박동현; 신하용, 대한산업공학회지, v.42, no.1, pp.65 - 72, 2016-02

1115
Mean-Variance Optimization for Asset Allocation

Kim, Jang Ho; Lee, Yongjae; Kim, Woo Chang; Fabozzi, Frank J., JOURNAL OF PORTFOLIO MANAGEMENT, v.47, no.5, pp.24 - 40, 2021-05

1116
Measurement of R-R Intervals with a Microprocessor

D.Lee; Kyung Soo Park, 대한인간공학회지, v.4, no.2, 1985-12

1117
Measurement of Workload by Cardiac Arrhythmia

박경수, 대한인간공학회지, v.2, no.2, 1983-12

1118
Mediator approach to direct workflow simulation

Lee, Duck Woong; Shin, Hayong; Choi, Byoung Kyu, SIMULATION MODELLING PRACTICE AND THEORY, v.18, no.5, pp.650 - 662, 2010-05

1119
Medical waste collection considering transportation and storage risk

Taslimi, Masoumeh; Batta, Rajan; Kwon, Changhyun, COMPUTERS & OPERATIONS RESEARCH, v.120, 2020-08

1120
Memory-Augmented Convolutional Neural Networks With Triplet Loss for Imbalanced Wafer Defect Pattern Classification

Hyun, Yunseung; Kim, Heeyoung, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.33, no.4, pp.622 - 634, 2020-11

1121
MES (manufacturing execution system) architecture for FMS compatible to ERP (enterprise planning system)

Choi, Byoung Kyu; Kim, BH, INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, v.15, no.3, pp.274 - 284, 2002

1122
Message-passing architecture and its construction in object-oriented rapid modeling for automated manufacturing system simulation

Hwang, MH; Choi, Byoung Kyu, SIMULATION, v.72, no.2, pp.90 - 104, 1999-02

1123
MILLING PARAMETER OPTIMIZATION THROUGH A DISCRETE VARIABLE TRANSFORMATION

CHANG, TC; WYSK, RA; DAVIS, RP; Choi, Byoung Kyu, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.20, no.4, pp.507 - 516, 1982

1124
Mimixizing Makespan on a Single Burn-In Oven with Job Families and Dynamic Job Arrivals Allowed

Sung, Chang Sup, COMPUTERS & OPERATIONS RESEARCH, v.29, no.8, pp.995 - 1007, 2002-07

1125
Minimax Approach for Logical Configuration in Reconfigurable Virtual Circuit Data Network

Sung, Chang Sup; park, s.k., IEICE TRANSACTIONS ON FUNDAMENTALS OF ELECTRONICS COMMUNICATIONS AND COMPUTER SCIENCES, v.E78A, no.8, pp.1029 - 1033, 1995-08

1126
Minimization of Waiting Time Variation in a Generalized Two-Machine Flowshop With Waiting Time Constraints and Skipping Jobs

Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.30, no.2, pp.155 - 165, 2017-05

1127
Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed

Lee, Ik Sun; Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.186, no.3, pp.931 - 952, 2008-05

1128
Minimizing Due Date Related Peformance Measures on Two Batch Processing Machines

Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.147, no.3, pp.644 - 656, 2003-06

1129
Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times

An, Young-Jin; Kim, Yeong-Dae; Choi, Seong-Woo, COMPUTERS & OPERATIONS RESEARCH, v.71, pp.127 - 136, 2016-07

1130
Minimizing Makespan in a Two-Machine Flowshop with Dynamic Arrivals Allowed

Sung, Chang Sup; Kim, YH, COMPUTERS AND OPERATIONS RESEARCH, v.29, no.3, pp.275 - 294, 2002-02

1131
Minimizing Makespan on a Single Burn-in Oven in Semiconductor Manufacturing

Sung, Chang Sup, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.120, no.3, pp.559 - 574, 2000-02

1132
Minimizing Makespan on a Single Burn-In Oven wih Job Families and Dynamic Job Arrivals Allowed

Sung, Chang Sup, COMPUTERS & OPERATIONS RESEARCH, v.120, no.3, pp.559 - 574, 2000-10

1133
Minimizing makespan on a two-machine re-entrant flowshop

Choi, SW; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.58, pp.972 - 981, 2007-07

1134
Minimizing makespan on an m-machine re-entrant flowshop

Choi, Seong-Woo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.35, no.5, pp.1684 - 1696, 2008-05

1135
Minimizing maximum completion time in a two-batch-processing-machine flowshop with dynamic arrivals allowed

Sung, Chang Sup; Yoon, SH, ENGINEERING OPTIMIZATION, v.28, no.3, pp.231 - 243, 1997-04

1136
MINIMIZING MEAN TARDINESS AND EARLINESS IN SINGLE-MACHINE SCHEDULING PROBLEMS WITH UNEQUAL DUE-DATES

Kim, Yeong-Dae; YANO, CA, NAVAL RESEARCH LOGISTICS, v.41, no.7, pp.913 - 933, 1994-12

1137
Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance

Lee, Ju-Yong; Kim, Yeong-Dae, COMPUTERS OPERATIONS RESEARCH, v.39, no.9, pp.2196 - 2205, 2012-09

1138
Minimizing total tardiness in a two-machine flowshop scheduling problem with availability constraint on the first machine

Lee, Ju-Yong; Kim, Yeong-Dae, COMPUTERS & INDUSTRIAL ENGINEERING, v.114, pp.22 - 30, 2017-12

1139
Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times

Jeong, Bong Joo; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.47, pp.72 - 80, 2014-07

1140
Minimizing total tardiness in an unrelated parallel-machine scheduling problem

Shim, SO; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.58, pp.346 - 354, 2007-03

rss_1.0 rss_2.0 atom_1.0