Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Issue Date 

Jump to a point in the index:

Showing results 5601 to 5620 of 5968

5601
젊은 성인 남자들의 키와 발부피의 일변화에 관한 연구 = Circadian changes of human stature and foot volume for young adult menlink

나건; Nah, Gun; et al, 한국과학기술원, 1985

5602
(A) single-product two-parallel facilities production planning model with capacity constraints = 생산용량이 제한된 2-병렬 설비의 단일제품 생산계획모형link

Byun, Jai-Hyun; 변재현; et al, 한국과학기술원, 1985

5603
Order-level inventory system with two suppiers = 두 공급자를 갖는 주문수준 재고체계link

Ko, Chang-Seong; 고창성; et al, 한국과학기술원, 1985

5604
Multi-stage lot-sizing under demand uncertainty and rolling schedule environment = 불확정수요하에서 회전기간법을 이용한 다단계 로트크기 결정기법link

Park, Pyung-Ung; 박병웅; Hwang, Hark; Yum, Bong-Jin; et al, 한국과학기술원, 1985

5605
(A) two-product three-facility production planning model in a combined parallel and serial system = 직렬-병렬이 혼합된 3-설비의 2-제품 생산계획모형link

Lee, Bong-Jae; 이봉재; et al, 한국과학기술원, 1985

5606
National R&D project selection and risk sharing for commercialization in decision analyst's viewpoint = 의사분석가의 관점에서 본 국가연구개발과제 선정과 기업화를 위한 위험배분link

Han, Kyeong-Hee; 한경희; et al, 한국과학기술원, 1985

5607
Present Worth of the Service Cost for Consumer Product Warranty

S.Yee; Park, Kyung Soo, IEEE TRANSACTIONS ON RELIABILITY, v.33, no.5, 1984-12

5608
A Stepwise Partial Enumeration Algorithm for Economic Lot Scheduling Problem

D.Yun; Park, Kyung Soo, IIE TRANSACTIONS, v.16, no.4, 1984-12

5609
A NOTE ON THE DEPARTURE PROCESS IN AN (S-1, S) INVENTORY SYSTEM

Park, Kyung Soo; AHN, BH, INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, v.15, no.10, pp.1107 - 1109, 1984-10

5610
전력산업에서의 경영과학의 응용

김세헌, 경영과학의 응용, v.1, no.1, pp.17 - 25, 1984-10

5611
A Multiproduct Facility-in-Series Production Planning Model

성창섭, 한국경영과학회지, v.9, no.2, pp.15 - 22, 1984-10

5612
Analysis of Interruption Effect on Elemental Motion Times

Hwang, Hark; ho chang lee, POLICY AND INFORMATION, v.8, no.1, 1984-06

5613
A Research on Oxygen Uptake & Heart Rate in Static Working Postures

H.Lim; K.S. Park, 대한인간공학회지, v.3, no.1, 1984-06

5614
An Evaluation of Lot-Sizing Rules under the Uncertainty of Demand and Lead Time

hark hwang; j.h. kim, 대한산업공학회지, v.10, no.1, pp.27 - 36, 1984-06

5615
Average mean square error of prediction for a multiple functional relationship model

염봉진, 한국통계학회지, v.13, no.2, pp.107 - 113, 1984-01

5616
Optimal Allocation of Inspection Effort in a Multi-Stage production process

Yum, Bong-Jin, 한국경영과학회 추계 학술발표대회, pp.0 - 0, 1984

5617
Average Mean Square Error of Prediction for a Multiple Functional Relationship Model

Yum, Bong-Jin, 한국통계학회 추계 학술논문발표대회, pp.0 - 0, 1984

5618
Production Lot Size Model for Deteriorating Items with Shortage

Hwang, Hark; s.b. choi, INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, v.15, no.11, 1984

5619
A Mixed 0-1 Linear program for the Inspection Location Problem

염봉진, 대한산업공학회지, v.10, no.1, pp.11 - 16, 1984

5620
AUTOMATIC RECOGNITION OF MACHINED SURFACES FROM A 3D SOLID MODEL

Choi, Byoung Kyu; BARASH, MM; ANDERSON, DC, COMPUTER-AIDED DESIGN, v.16, no.2, pp.81 - 86, 1984

rss_1.0 rss_2.0 atom_1.0