26 | A 2-Stage Assembly Scheduling Problem for Minimizing Sum of Completion Times 성창섭researcher, 대한 산업공학회, pp.1 - 18, 2005 |
27 | A 3D factory simulator for automated manufacturing system design Park, BC; Ryu, HY; Park, JH; Choi, Byoung Kyuresearcher, The 36thCIRP International Seminar on Manufacturing Systems, pp.0 - 0, The 36th CIRP, 2003-06 |
28 | A backward approach in list scheduling algorithms for multi-machine tardiness problems Kim, Yeong-Daeresearcher, COMPUTERS AND OPERATIONS RESEARCH, v.22, no.3, pp.307 - 319, 1995-03 |
29 | A basic study on the technology transfer of automotive industry in China = 중국의 자동차 산업 기술 이전에 관한 기초연구link Han, Ming-Xu; 한명욱; Yum, Bong-Jinresearcher; 염봉진; et al, 한국과학기술원, 2007 |
30 | A Batching and Sequencing Problem under Mean Flow Time Measure on a Single machine with Batch Size Restrictions 성창섭researcher, 대한산업공학회 추계학술대회, 1992 |
31 | A Bayesian nonparametric mixture measurement error model with application to spatial density estimation using mobile positioning data with multi-accuracy and multi-coverage Lee, Youngmin; Jeong, Taewon; Kim, Heeyoungresearcher, TECHNOMETRICS, v.62, no.2, pp.173 - 183, 2020-04 |
32 | A berth allocation planning problem with direct transshipment consideration Liang, Chengji; Hwang, Harkresearcher; Gen, Mitsuo, JOURNAL OF INTELLIGENT MANUFACTURING, v.23, no.6, pp.2207 - 2214, 2012-12 |
33 | A Bi-objective Hybrid Constrained Optimization (HyCon) Method Using a Multi-Objective and Penalty Function Approach Datta, Rituparna; Deb, Kalyanmoy; Segev, Avivresearcher, IEEE Congress on Evolutionary Computation 2017, pp.317 - 324, IEEE Computer Society, 2017-06-07 |
34 | A Bibliography of the Literature on Process Capability Indices: 2000-2009 Yum, Bong-Jinresearcher; Kim, Kwan-Woo, QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, v.27, no.3, pp.251 - 268, 2011-04 |
35 | A Biomechanical Evaluation of Two Methods of Manual Load Lifting Park, Kyung Sooresearcher, AIIE TRANSACTIONS, v.6, no.2, 1974-06 |
36 | A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints Park, MW; Kim, Yeong-Daeresearcher, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.123, no.3, pp.504 - 518, 2000-06 |
37 | A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property Shim, Sang-Oh; Kim, Yeong-Daeresearcher, COMPUTERS & OPERATIONS RESEARCH, v.35, no.3, pp.863 - 875, 2008-03 |
38 | A Branch and Bound Algorithm for Cyclic Scheduling of Timed Petri Nets Jung, Chihyun; Kim, Hyunjungresearcher; Lee, Tae-Eogresearcher, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.1, pp.309 - 323, 2015-01 |
39 | A branch and bound algorithm for determining locations of long-term care facilities Kim, Dong-Guen; Kim, Yeong-Daeresearcher, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.206, no.1, pp.168 - 177, 2010-10 |
40 | A branch and bound algorithm for locating input and output points of departments on the block layout Kim, JG; Kim, Yeong-Daeresearcher, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.50, no.5, pp.517 - 525, 1999-05 |
41 | A Branch and Bound Algorithm for Three-Machine Flow Shop with Overlapping Waiting Time Constraints Kim, Hyunjungresearcher; Lee, JH, IFAC PAPERSONLINE, v.50, no.1, pp.1101 - 1105, 2017-07 |
42 | A branch and bound algorithm to minimize total tardiness of jobs in a two identical-parallel-machine scheduling problem with a machine availability constraint Lee, Ju Yong; Kim, Yeong-Daeresearcher, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.66, no.9, pp.1542 - 1554, 2015-09 |
43 | A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints Joo, Byung Jun; Kim, Yeong-Daeresearcher, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.60, pp.572 - 582, 2009-04 |
44 | A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness Lee, GC; Kim, Yeong-Daeresearcher, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.42, pp.4731 - 4743, 2004-11 |
45 | A BRANCH-AND-BOUND APPROACH FOR SPARE UNIT ALLOCATION IN A SERIES SYSTEM Sung, Chang Supresearcher; LEE, HK, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.75, no.1, pp.217 - 232, 1994-05 |