Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" byTitle

Showing results 26 to 45 of 5545

26
A 2-Stage Assembly Scheduling Problem for Minimizing Sum of Completion Times

성창섭researcher, 대한 산업공학회, pp.1 - 18, 2005

27
A 3D factory simulator for automated manufacturing system design

Park, BC; Ryu, HY; Park, JH; Choi, Byoung Kyuresearcher, The 36thCIRP International Seminar on Manufacturing Systems, pp.0 - 0, The 36th CIRP, 2003-06

28
A backward approach in list scheduling algorithms for multi-machine tardiness problems

Kim, Yeong-Daeresearcher, COMPUTERS AND OPERATIONS RESEARCH, v.22, no.3, pp.307 - 319, 1995-03

29
A basic study on the technology transfer of automotive industry in China = 중국의 자동차 산업 기술 이전에 관한 기초연구link

Han, Ming-Xu; 한명욱; Yum, Bong-Jinresearcher; 염봉진; et al, 한국과학기술원, 2007

30
A Batching and Sequencing Problem under Mean Flow Time Measure on a Single machine with Batch Size Restrictions

성창섭researcher, 대한산업공학회 추계학술대회, 1992

31
A Bayesian nonparametric mixture measurement error model with application to spatial density estimation using mobile positioning data with multi-accuracy and multi-coverage

Lee, Youngmin; Jeong, Taewon; Kim, Heeyoungresearcher, TECHNOMETRICS, v.62, no.2, pp.173 - 183, 2020-04

32
A berth allocation planning problem with direct transshipment consideration

Liang, Chengji; Hwang, Harkresearcher; Gen, Mitsuo, JOURNAL OF INTELLIGENT MANUFACTURING, v.23, no.6, pp.2207 - 2214, 2012-12

33
A Bi-objective Hybrid Constrained Optimization (HyCon) Method Using a Multi-Objective and Penalty Function Approach

Datta, Rituparna; Deb, Kalyanmoy; Segev, Avivresearcher, IEEE Congress on Evolutionary Computation 2017, pp.317 - 324, IEEE Computer Society, 2017-06-07

34
A Bibliography of the Literature on Process Capability Indices: 2000-2009

Yum, Bong-Jinresearcher; Kim, Kwan-Woo, QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, v.27, no.3, pp.251 - 268, 2011-04

35
A Biomechanical Evaluation of Two Methods of Manual Load Lifting

Park, Kyung Sooresearcher, AIIE TRANSACTIONS, v.6, no.2, 1974-06

36
A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints

Park, MW; Kim, Yeong-Daeresearcher, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.123, no.3, pp.504 - 518, 2000-06

37
A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property

Shim, Sang-Oh; Kim, Yeong-Daeresearcher, COMPUTERS & OPERATIONS RESEARCH, v.35, no.3, pp.863 - 875, 2008-03

38
A Branch and Bound Algorithm for Cyclic Scheduling of Timed Petri Nets

Jung, Chihyun; Kim, Hyunjungresearcher; Lee, Tae-Eogresearcher, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.1, pp.309 - 323, 2015-01

39
A branch and bound algorithm for determining locations of long-term care facilities

Kim, Dong-Guen; Kim, Yeong-Daeresearcher, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.206, no.1, pp.168 - 177, 2010-10

40
A branch and bound algorithm for locating input and output points of departments on the block layout

Kim, JG; Kim, Yeong-Daeresearcher, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.50, no.5, pp.517 - 525, 1999-05

41
A Branch and Bound Algorithm for Three-Machine Flow Shop with Overlapping Waiting Time Constraints

Kim, Hyunjungresearcher; Lee, JH, IFAC PAPERSONLINE, v.50, no.1, pp.1101 - 1105, 2017-07

42
A branch and bound algorithm to minimize total tardiness of jobs in a two identical-parallel-machine scheduling problem with a machine availability constraint

Lee, Ju Yong; Kim, Yeong-Daeresearcher, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.66, no.9, pp.1542 - 1554, 2015-09

43
A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints

Joo, Byung Jun; Kim, Yeong-Daeresearcher, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.60, pp.572 - 582, 2009-04

44
A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardiness

Lee, GC; Kim, Yeong-Daeresearcher, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.42, pp.4731 - 4743, 2004-11

45
A BRANCH-AND-BOUND APPROACH FOR SPARE UNIT ALLOCATION IN A SERIES SYSTEM

Sung, Chang Supresearcher; LEE, HK, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.75, no.1, pp.217 - 232, 1994-05

Discover

Type

. next

Open Access

Date issued

. next

Subject

. next

rss_1.0 rss_2.0 atom_1.0