3821 | Scheduling for multiple machines with S-precedence constraints = 서비스 우선순위를 고려한 복합시스템 스케쥴링 연구link Kim, Eun-Seok; 김은석; et al, 한국과학기술원, 2008 |
3822 | Scheduling for the Photolithography Process in Semiconductor Manufacturing Chang Sup Sung, pp.0 - 0, 1996-04-01 |
3823 | Scheduling healthcare services in a home healthcare system An, Y-J; Kim, Yeong-Dae; Jeong, B. J.; Kim, S-D, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.63, no.11, pp.1589 - 1599, 2012-11 |
3824 | Scheduling in a Two-machine Flowshop with Batch Processing Machine(s) for Earliness/Tardiness Measure under a Common Due Date Sung, Chang Sup; Min, JI, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.131, no.1, pp.95 - 106, 2001-05 |
3825 | Scheduling in semiconductor wafer fabrication facilities producing multiple product types with distinct due dates = 주문형 반도체 제조공정에서의 일정계획link Kim, Hyung-Un; 김형운; et al, 한국과학기술원, 2000 |
3826 | Scheduling In-Line Multiple Cluster Tools Kim, Hyunjung; Lee, Jun-Ho; Baik, Sunhee; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.28, no.2, pp.171 - 179, 2015-05 |
3827 | Scheduling in-line multiple cluster tools: A decomposition approach Kim, Hyun-Jung; Lee, Tae-Eog; Lee, Jun-Ho; Kim, Chulhan; Baik, Sun-Hee, IEEE Conference on Mechatronics and Automation, IEEE, 2012-08-08 |
3828 | Scheduling Jobs in a Combined Production-Delivery Supply Chain 성창섭, 한국SCM, 2004 |
3829 | Scheduling jobs with stochastic holding costs Lee, Dabeen; Vojnovic, Milan, 35th Conference on Neural Information Processing Systems, NeurIPS 2021, pp.19375 - 19384, The Neural Information Processing Systems Foundation, 2021-12-06 |
3830 | Scheduling Lot Switching Operations for Cluster Tools Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.26, no.4, pp.592 - 601, 2013-11 |
3831 | Scheduling of a dual-armed cluster tool with two independent robot arms Tonke, Daniel; Lee, Tae-Eog, IEEE Conference on Automation Science and Engineering, IEEE, 2012-08-22 |
3832 | Scheduling of a dual-armed cluster tool with two independently working robot arms = 독립적으로 움직이는 두 로봇 팔을 갖는 양팔 클러스터 장비의 스케줄링link Tonke, Daniel; Tonke, H.D.; et al, 한국과학기술원, 2010 |
3833 | Scheduling of a Flow Shop without Intermediate Queues but with Job Holders Required for Processing Sung, Chang Sup, pp.0 - 0, 1993-04-01 |
3834 | Scheduling of arc welding robot considering heat-caused distortion = 열변형을 고려한 아크용접 로봇의 스케줄링link Kim, Hwa-Jung; 김화중; et al, 한국과학기술원, 2002 |
3835 | Scheduling of Cluster Tools with Complex Scheduling Requirements Yu, Tae Sun; Lee, Tae-Eog, 20th Conference of the International Federation of Operational Research Societies, IFORS, 2014-07-15 |
3836 | Scheduling of cluster tools with independent dual-arm under wafer delay constraints = 체재시간 제약을 가지는 독립된 두 팔 클러스터 장비의 스케줄링link Kwon, Yongmin; Lee, Tae-Eog; et al, 한국과학기술원, 2017 |
3837 | Scheduling of cluster tools with k-periodic chamber cleaning operationslink Lee, Tae-Gyung; Lee, Tae-Eog; et al, 2021 |
3838 | Scheduling of cluster tools with ready time constraints for small lot production Lee, Tae-Eog; Kim, Hyun-Jung, IEEE 2011 International Conference on Automation Science and Engineering, pp.96 - 101, IEEE, 2011-08-25 |
3839 | Scheduling of dual independent armed cluster tool with unbalanced workload = 독립적인 두팔을 가진 클러스터 장비의 불균형한 워크로드 스케쥴링link Sheen, Dong Yup; 신동엽; et al, 한국과학기술원, 2015 |
3840 | Scheduling of Dual-armed Cluster Tools with 2-cyclic Chamber Cleaning Operations 이태경; 이태억, 2018춘계공동학술대회, 대한산업공학회, 2018-04-05 |