3561 | Production and Inspection Scheduling in a Deteriorating Production System with Inspection Error 성창섭, 한국경영과학회/대한산업공학회 춘계공동학술대회, 1993 |
3562 | Production and pricing policies in reverse logistics = 회수물류 체계의 운용에 관한 연구link Jung, Ki-Seung; 정기승; et al, 한국과학기술원, 2009 |
3563 | Production Lot Size Model for Deteriorating Items with Shortage Hwang, Hark; s.b. choi, INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, v.15, no.11, 1984 |
3564 | Production planning and control in semiconductor wafer fabrication and probing facilities = 반도체 웨이퍼 제조공정과 프로브공정의 생산 계획 작성 및 통제에 관한 연구link Bang, June-Young; 방준영; et al, 한국과학기술원, 2009 |
3565 | Production planning and scheduling in a leadframe manufacturing system Lee, Geun-Cheol; Choi, Yong-Chan; Lee, Eun-Young; Kim, Yeong-Dae, INFOMRS-KORMS 2000, pp.970 -, 2000 |
3566 | Production Planning and Sequencing Optimization at Woongjin Chemical Sung, Shin Woong; Jang, Young Jae; Lee, Dong Seop, Asia Pacific Industrial Engineering & Management Systems Conference, Asia Pacific Industrial Engineering and Management Society, 2013-12-05 |
3567 | Production Planning and Shipment Scheduling for a Multi-Product ( 1:1:N) Inventory Model with Cyclic Production Policy Incorporated Sung, Chang Sup, 2003 MSOM conference(INFORMS), pp.1 - 16, 2003 |
3568 | Production planning for fabrication and packaging processes of light emitting diodes with overlapped product binning = 제품 분화가 중첩되는 발광다이오드의 제조 및 조립 공정의 생산계획link Yang, Ji-Won; Lee, Tae-Eog; et al, 한국과학기술원, 2019 |
3569 | Production planning in a two-level supply chain for production-time-dependent products with dynamic demands Han, Jun-Hee; Lee, Ju-Yong; Kim, Yeong-Dae, COMPUTERS & INDUSTRIAL ENGINEERING, v.135, pp.1 - 9, 2019-09 |
3570 | Production planning method using the push-back heuristic algorithm: Implementation in a micro filter manufacturer in South Korea Sung, Shin Woong; Jang, Young Jae; Lee, Sung Wook, INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, v.14, no.4, pp.401 - 412, 2015-12 |
3571 | Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates Kim, Yeong-Dae; Kim, JG; Kim, HU, IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, v.17, no.5, pp.589 - 598, 2001-10 |
3572 | Production scheduling in a system with batch processing machines = 뱃치 공정 설비를 갖춘 시스템에서의 생산일정계획link Choung, You-In; 정유인; et al, 한국과학기술원, 1999 |
3573 | Production Scheduling in Assembly/Disaasembly System 성창섭, 한국경영과학회/대한산업공학회 춘계공동학술대회, 1995 |
3574 | Production scheduling in assembly/disassembly systems = 조립 및 분리 생산 시스템에서의 일정계획link Yoon, Sang-Hum; 윤상흠; et al, 한국과학기술원, 1997 |
3575 | Production scheduling of products with subassemblies = 부분조립품을 가지는 제품의 생산일정계획link Kim, Tae-Hyung; 김태형; et al, 한국과학기술원, 1993 |
3576 | Production sequencing problem with re-entrant work flows and sequence dependent setup times Hwang, Hark, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.36, no.9, pp.2435 - 2450, 1998 |
3577 | Production Sequencing Problem with Reentrant Work Flows and Sequence Dependent Setup Times Hwang, Hark, , 1996-01-01 |
3578 | Production Sequencing Problem with Reentrant Work Flows and Sequence Dependent Setup Times Hwang, Hark, COMPUTERS & INDUSTRIAL ENGINEERING, v.33, no.3, pp.773 - 776, 1997-01 |
3579 | Production Switching Mechanism for an Unreliable Two-Stage Production Line 고시근; 황학, J. OF THE KOREAN INSTITUTE OF INDUSTRIAL ENGINEERS, v.24, no.1, pp.105 - 113, 1998-01 |
3580 | Production system-based simulation for backward on-line job change scheduling Kim, Tae-Dong; Choi, Byoung-Kyu, SIMULATION MODELLING PRACTICE AND THEORY, v.40, pp.12 - 27, 2014-01 |