Showing results 1 to 2 of 2
Integrated Scheduling of a Dual-Armed Cluster Tool for Maximizing Steady Schedule Patterns Kim, Woojin; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON SYSTEMS, MAN, AND CYBERNETICS: SYSTEMS, v.51, no.12, pp.7282 - 7294, 2021-12 |
K-Cyclic Schedules and the Worst-Case Wafer Delay in a Dual-Armed Cluster Tool Roh, Dong-Hyun; Lee, Tae-Gyung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.32, no.2, pp.236 - 249, 2019-05 |
Discover