Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Subject SCHEDULABILITY

Showing results 1 to 22 of 22

1
Adaptive Scheduling of Cluster Tools With Wafer Delay Constraints and Process Time Variation

Lim, Yuchul; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.17, no.1, pp.375 - 388, 2020-01

2
Analysis of Backward Sequence for Single-Armed Cluster Tools With Processing Time Variations

Lee, Jun-Ho; Kim, Jun-Ho, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.17, no.4, pp.2167 - 2174, 2020-10

3
Characterizing Token Delays of Timed Event Graphs for K-Cyclic Schedules

Lee, Tae-Eog; Kim, Hyunjung; Roh, Dong-Hyun; Sreenivas, Ramavarapu S., IEEE TRANSACTIONS ON AUTOMATIC CONTROL, v.62, no.2, pp.961 - 966, 2017-02

4
Cleaning Plan Optimization for Dual-Armed Cluster Tools With General Chamber Cleaning Periods

Lee, Tae-Gyung; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.20, no.3, pp.1890 - 1906, 2023-07

5
Closed-Form Expressions on Lot Completion Time for Dual-Armed Cluster Tools With Parallel Processing Modules

Kim, Hyunjung; Lee, Jun-Ho, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.2, pp.898 - 907, 2019-04

6
Completion Time Analysis of Wafer Lots in Single-Armed Cluster Tools With Parallel Processing Modules

Lee, Jun-Ho; Kim, Hyunjung, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.14, no.4, pp.1622 - 1633, 2017-10

7
Controlled Wafer Release in Clustered Photolithography Tools: Flexible Flow Line Job Release Scheduling and an LMOLP Heuristic

Park, Kyungsu; Morrison, James R, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.2, pp.642 - 655, 2015-04

8
Cyclic Scheduling of Cluster Tools With Nonidentical Chamber Access Times Between Parallel Chambers

Kim, Dae-Kyu; Jung, Yu-Ju; Jung, Chi-Hyun; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.25, no.3, pp.420 - 431, 2012-08

9
Feedback Control of Cluster Tools for Regulating Wafer Delays

Kim, Chulhan; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.2, pp.1189 - 1199, 2016-04

10
K-Cyclic Schedules and the Worst-Case Wafer Delay in a Dual-Armed Cluster Tool

Roh, Dong-Hyun; Lee, Tae-Gyung; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.32, no.2, pp.236 - 249, 2019-05

11
Makespan Analysis of Lot Switching Period in Cluster Tools

Lee, Jun-Ho; Kim, Hyunjung, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.29, no.2, pp.127 - 136, 2016-05

12
Modelling and simulation of automated manufacturing systems for evaluation of complex schedules

Kim, Chulhan; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.51, no.12, pp.3734 - 3747, 2013-06

13
Noncyclic Scheduling of Cluster Tools With a Branch and Bound Algorithm

Kim, Hyunjung; Lee, Jun-Ho; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.12, no.2, pp.690 - 700, 2015-04

14
Optimal Scheduling of Transient Cycles for Single-Armed Cluster Tools With Parallel Chambers

Kim, Dae-Kyu; Lee, Tae-Eog; Kim, Hyunjung, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.13, no.2, pp.1165 - 1175, 2016-04

15
Schedule Restoration for Single-Armed Cluster Tools

Kim, Ja-Hee; Zhou, MengChu; Lee, Tae-Eog, IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, v.27, no.3, pp.388 - 399, 2014-08

16
Scheduling Cluster Tools for Concurrent Processing of Two Wafer Types

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.11, no.2, pp.525 - 536, 2014-04

17
Scheduling cluster tools for concurrent processing of two wafer types with PM sharing

Lee, Jun-Ho; Kim, Hyunjung; Lee, Tae-Eog, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.53, no.19, pp.6007 - 6022, 2015-10

18
Scheduling Cluster Tools With Ready Time Constraints for Consecutive Small Lots

Kim, Hyun-Jung; Lee, Jun-Ho; Jung, Chi-Hyun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.10, no.1, pp.145 - 159, 2013-01

19
Scheduling Dual-Armed Cluster Tools for Concurrent Processing of Multiple Wafer Types With Identical Job Flows

Ko, Sung-Gil; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.16, no.3, pp.1058 - 1070, 2019-07

20
Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations

Yu, Tae Sun; Kim, Hyunjung; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.15, no.2, pp.705 - 716, 2018-04

21
The Impact of Processing Time Variations on Swap Sequence Performance in Dual-Armed Cluster Tools

Lee, Jun-Ho; Kim, Hyun-Jung, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.20, no.4, pp.2668 - 2677, 2023-10

22
Wafer Delay Analysis and Workload Balancing of Parallel Chambers for Dual-Armed Cluster Tools With Multiple Wafer Types

Ko, Sung-Gil; Yu, Tae-Sun; Lee, Tae-Eog, IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, v.18, no.3, pp.1516 - 1526, 2021-07

rss_1.0 rss_2.0 atom_1.0