Showing results 1 to 2 of 2
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint Kim, Yeong-Dae; Joo, Byung-Jun; Shin, Jong-Ho, JOURNAL OF HEURISTICS, v.15, no.1, pp.19 - 42, 2009-02 |
Production scheduling in a system with batch processing machines = 뱃치 공정 설비를 갖춘 시스템에서의 생산일정계획link Choung, You-In; 정유인; et al, 한국과학기술원, 1999 |
Discover