Browse "Dept. of Industrial and Systems Engineering(산업및시스템공학과)" by Subject BACKWARD APPROACH

Showing results 1 to 7 of 7

1
Bottleneck-focused scheduling for a hybrid flowshop

Lee, GC; Kim, Yeong-Dae; Choi, SW, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.42, pp.165 - 181, 2004-01

2
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint

Kim, Yeong-Dae; Joo, Byung-Jun; Shin, Jong-Ho, JOURNAL OF HEURISTICS, v.15, no.1, pp.19 - 42, 2009-02

3
Minimizing total tardiness in an unrelated parallel-machine scheduling problem

Shim, SO; Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.58, pp.346 - 354, 2007-03

4
Parallel machine scheduling considering a job-splitting property

Kim, Yeong-Dae; Shim, SO; Kim, SB; Choi, Yong-Chan; Yoon, HM, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.42, pp.4531 - 4546, 2004-11

5
Scheduling algorithms for a semiconductor probing facility

Bang, June-Young; Kim, Yeong-Dae, COMPUTERS & OPERATIONS RESEARCH, v.38, no.3, pp.666 - 673, 2011-03

6
Scheduling algorithms for an air conditioner manufacturing system composed of multiple parallel assembly lines

Choi, YC; Kim, Yeong-Dae; Bang, JY, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, v.51, pp.1225 - 1241, 2010-12

7
Scheduling on parallel identical machines to minimize total tardiness

Shim, SO; Kim, Yeong-Dae, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, v.177, pp.135 - 146, 2007-02

rss_1.0 rss_2.0 atom_1.0