Showing results 61121 to 61140 of 91093
Scheduling of a Flow Shop without Intermediate Queues but with Job Holders Required for Processing Sung, Chang Sup, pp.0 - 0, 1993-04-01 |
Scheduling of Batch Manufacturing Process in the Chemical Plants Park, Sunwon, The 14th KACC, KACC, 1999-01-01 |
Scheduling of Batch Manufacturing Process in The Chemical Plants with An Optimal Control Approach Park, Sunwon, The 12th Symposium on Chemical Engineering, pp.175 - 176, 1999-01-01 |
Scheduling of Cluster Tools with Complex Scheduling Requirements Yu, Tae Sun; Lee, Tae-Eog, 20th Conference of the International Federation of Operational Research Societies, IFORS, 2014-07-15 |
Scheduling of cluster tools with ready time constraints for small lot production Lee, Tae-Eog; Kim, Hyun-Jung, IEEE 2011 International Conference on Automation Science and Engineering, pp.96 - 101, IEEE, 2011-08-25 |
Scheduling of Dual-armed Cluster Tools with 2-cyclic Chamber Cleaning Operations 이태경; 이태억, 2018춘계공동학술대회, 대한산업공학회, 2018-04-05 |
Scheduling of Dual-armed Cluster Tools with k-periodic Chamber Cleaning LEE, TAE GYUNG; Lee, Tae-Eog, 2018 대한산업공학회 추계학술대회, pp.747 - 777, 대한산업공학회, 2018-11-09 |
Scheduling of Dual-Armed Cluster Tools with Time Constraints Kim, Ja-Hee; Lee, Tae-Eog; Lee, Hwan-Yong, MASM, pp.1 - 6, 2002-04 |
Scheduling of flexible manufacturing systems employing automated guided vehicles Lee, Doo Yong, International Conference on CAD/CAM Robotics and Factories of the Future, pp.139 - 144, 1993-08 |
Scheduling of multimedia traffic for continuous media in packet-switched networks Khil, Ara; Maeng, SeungRyoul, Multimedia Computing and Networking, SPIE, pp.29 - 40, International Society for Optical Engineering (SPIE), 1997-01 |
Scheduling of Petri nets as a multi-objective shortest path problem Wikborg, Uno; Lee, Tae-Eog, IEEE Conference on Automation Science and Engineering, IEEE, 2012-08-22 |
Scheduling of Primary Steelmaking Processes with an Optimal Control Approach Park, Sunwon, KIChE Spring Meeting, KIChE, 2000-01-01 |
Scheduling of Primary Steelmaking Processes: Part 1. Mathematical Modeling Park, Sunwon, KIChE Spring Meeting, KIChE, 2000-01-01 |
Scheduling of Primary Steelmaking processes: Part II. Environmentally Friendly Scheduling Park, Sunwon, KIChE Spring Meeting, KIChE, 2000-01-01 |
Scheduling of Refinery Processes with An Optimal Control Approach Park, Sunwon, The 8th Congress of Asian Pacific Confederation of Chemical Engineering (APCChE'99), Proceedings on 8th APCChE Congress, 1999-01-01 |
Scheduling of Refinery Processes with An Otpimal Control Approach Park, Sunwon, KIChE Spring Meeting, KIChE, 1999-01-01 |
Scheduling of semi-independent real-time components: Overrun methods and resource holding times Behnam, M.; Shin, Insik; Nolte, T.; Nolin, M., IEEE Symposium on Emerging Technologies and Factory Automation, v.0, no.0, pp.575 - 582, IEEE, 2008-09 |
Scheduling of Shipyard Block Assembly Process using Constraint Satisfaction Problem 김희문; 강장하; 박성수, 한국경영과학회/대한산업공학회 춘계공동학술대회, pp.697 - 703, 2002 |
Scheduling of Steelmaking Processes Considering Environmental Impacts Park, Sunwon, 99 Korea-China Workshop on Process Systems Engineering, pp.127 - 130, 1999-01-01 |
Scheduling of Three-Operation Jobs in a Two-Machine Flow Shop with Mean Flow Time Measure 성창섭, 한국경영과학회, 2006 |
Discover