Due-date based scheduling methods in a leadframe manufacturing System리드프레임 생산 시스템에서의 납기를 고려한 일정계획에 관한 연구

Cited 0 time in webofscience Cited 0 time in scopus
  • Hit : 532
  • Download : 0
This research focuses on scheduling problem in a leadframe manufacturing system with the objective of minimizing mean tardiness of orders. The leadframe manufacturing system is the flowshop with several special characteristics: parallel machines at each production stage, sequence-dependent setup times and multiple products with different process plans. We suggest two heuristic methods to determine schedules of production lots at each stage. One is a method based on lot sizing and dispatching rule and the other is a method based on the idea of Optimized Production Technology (OPT). To evaluate performance of the suggested methods, a simulation model of a real leadframe manufacturing system is developed and computational experiments are performed on randomly generated problems. Results of the tests show that the suggested methods perform better than existing methods.
Advisors
Kim, Yeong-Daeresearcher김영대researcher
Description
한국과학기술원 : 산업공학과,
Publisher
한국과학기술원
Issue Date
2001
Identifier
165620/325007 / 000993408
Language
eng
Description

학위논문(석사) - 한국과학기술원 : 산업공학과, 2001.2, [ ii, 32 p. ]

Keywords

parallel machine; due-date; scheduling; leadframe; 리드프레임; 병렬기계; 납기; 일정계획

URI
http://hdl.handle.net/10203/41607
Link
http://library.kaist.ac.kr/search/detail/view.do?bibCtrlNo=165620&flag=dissertation
Appears in Collection
IE-Theses_Master(석사논문)
Files in This Item
There are no files associated with this item.

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0