Evaluation of Preventive Maintenance Segregation: A Multi Factorial Study

Cited 5 time in webofscience Cited 0 time in scopus
  • Hit : 339
  • Download : 0
Recently, several papers on preventive maintenance (PM) have shown that segregation of PM's can be beneficial when it comes to improving factory performance. However, these were limited to either cases of equal PM segregation and/or without consideration of other factors and operating conditions such as incurred setup or the number of tools in the toolset. In this paper, we extend previous work in this area in two major respects. First, we consider the more realistic case of PM segregation into equal or unequal portions and second, we evaluate the impact of PM segregation under various operating conditions via simulation. Our simulation experiments provide insight and guidelines for practitioners in planning the PM activity such that the overall performance is improved. © 1988-2012 IEEE.
Publisher
IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
Issue Date
2017-11
Language
English
Article Type
Article
Citation

IEEE Transactions on Semiconductor Manufacturing, v.30, no.4, pp.508 - 514

ISSN
0894-6507
DOI
10.1109/TSM.2017.2755178
URI
http://hdl.handle.net/10203/244079
Appears in Collection
IE-Journal Papers(저널논문)
Files in This Item
There are no files associated with this item.
This item is cited by other documents in WoS
⊙ Detail Information in WoSⓡ Click to see webofscience_button
⊙ Cited 5 items in WoS Click to see citing articles in records_button

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0