A production planning in highly automated manufacturing system considering multiple process plans with different energy requirements

Cited 29 time in webofscience Cited 32 time in scopus
  • Hit : 195
  • Download : 0
This paper focuses on a production planning problem in a highly automated manufacturing system considering multiple process plans with different energy requirements. The system consists of several closely interconnected sub-systems such as the processing system, the material (part) handling system, the tool transport system and the auxiliary system responsible for a supply of cooling/lubricants and a waste disposal. We propose a methodology for an estimation of energy consumption and material flows that are incurred at a system level with respect to multiple process plans for a part type. In addition, this study focuses on a production planning problem with the objective to minimize the weighted sum of energy consumption, inventory holding cost and backorder cost on a FMS considering multiple process plans. The production planning model is developed as a linear programming model. The benefit coming from the adoption of suggested model has been addressed with reference to a real industrial use case study.
Publisher
SPRINGER LONDON LTD
Issue Date
2014-02
Language
English
Article Type
Article
Keywords

MODELS

Citation

INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, v.70, no.5-8, pp.853 - 867

ISSN
0268-3768
DOI
10.1007/s00170-013-5306-1
URI
http://hdl.handle.net/10203/205459
Appears in Collection
Files in This Item
There are no files associated with this item.
This item is cited by other documents in WoS
⊙ Detail Information in WoSⓡ Click to see webofscience_button
⊙ Cited 29 items in WoS Click to see citing articles in records_button

qr_code

  • mendeley

    citeulike


rss_1.0 rss_2.0 atom_1.0