Showing results 1 to 2 of 2
ROLLING SCHEDULES FOR A DYNAMIC LOT-SIZING PROBLEM WITH START-UP COST Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.22, no.2, pp.137 - 152, 1994 |
SETUP COST REDUCTION IN A DYNAMIC LOT-SIZE MODEL WITH MULTIPLE FINITE PRODUCTION-RATES Sung, Chang Sup, ENGINEERING OPTIMIZATION, v.24, no.1, pp.19 - 37, 1995 |
Discover