Showing results 1 to 2 of 2
Production planning method using the push-back heuristic algorithm: Implementation in a micro filter manufacturer in South Korea Sung, Shin Woong; Jang, Young Jae; Lee, Sung Wook, INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, v.14, no.4, pp.401 - 412, 2015-12 |
중첩변환기법의 영상압축응용 연구 = Study on video compression using overlapped transform techniqueslink 황찬식; Hwang, Chan-Sik; et al, 한국과학기술원, 1996 |
Discover