Showing results 1 to 3 of 3
A heuristic algorithm for identical parallel machine scheduling: splitting jobs, sequence-dependent setup times, and limited setup operators Lee, Jun-Ho; Kim, Hyun-Jung, FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, v.33, no.4, pp.992 - 1026, 2021-12 |
Scheduling algorithms for an air conditioner manufacturing system composed of multiple parallel assembly lines Choi, YC; Kim, Yeong-Dae; Bang, JY, INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, v.51, pp.1225 - 1241, 2010-12 |
Scheduling uniform parallel dedicated machines with job splitting, sequence-dependent setup times, and multiple servers Kim, Hyun-Jung; Lee, Jun-Ho, COMPUTERS & OPERATIONS RESEARCH, v.126, 2021-02 |
Discover