Showing results 1 to 3 of 3
Co-evolutionary genetic algorithm for multi-machine scheduling: coping with high performance variability Baek, DH; Yoon, Wan Chul, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, v.40, no.1, pp.239 - 254, 2002-01 |
HEURISTICS FOR FLOWSHOP SCHEDULING PROBLEMS MINIMIZING MEAN TARDINESS Kim, Yeong-Dae, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, v.44, no.1, pp.19 - 28, 1993-01 |
Production planning method using the push-back heuristic algorithm: Implementation in a micro filter manufacturer in South Korea Sung, Shin Woong; Jang, Young Jae; Lee, Sung Wook, INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, v.14, no.4, pp.401 - 412, 2015-12 |
Discover